AM27-128 Elevator Maintenance Services Edge of the Cedars State Park Museum

Active AM27-128 IFBFacilities & JanitorialUtah Division of State Parks
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Utah Division of State Parks (Utah) posted this IFB on Nov 23, 2026. Responses are due Dec 15, 2026. Category: Facilities & Janitorial. Solicitation number AM27-128.

Solicitation details

General information

Solicitation number
AM27-128
Notice type
IFB
Place of performance
Utah

Agency and category

Agency
Utah Division of State Parks
Category
014Facilities & Janitorial
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The purpose of this IFB is to enter into a contract to provide: Comprehensive quarterly elevator maintenance service and emergency services for two elevators located at the Edge of the Cedars State Park Museum.

The Division of State Parks seeks a five-year contract for comprehensive quarterly elevator maintenance service and emergency services for two elevators located at the Edge of the Cedars State Park Museum.

It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.

Scope

Contractor shall furnish all management, supervision, materials, labor, spare parts, and equipment necessary to provide for the quarterly examination and servicing of the designated elevators according to the following requirements:

  • Contractor shall provide preventive maintenance, required testing, adjustments, cleaning and lubrication on a quarterly basis during the months of March, June, September, and December. This will include supervision, installation of repair or replacement parts, consumable materials, equipment, tools and each and every item of expense necessary including emergency call back service.
  • Contractor shall provide trained, qualified, and technically skilled elevator mechanics properly certified under Utah Administrative Code R616-3 for all services rendered at Edge of the Cedars State Park Museum.
  • Contractor shall perform full load tests according to State regulations and standards and ASME A17.1 / CSA B44 Safety Code for Elevators and Escalators as adopted and amended by the State of Utah (Utah Administrative Code R616-3).
  • Contractor shall provide all repairs or parts that would maintain safety and usefulness of the elevator according to all legal codes and standards that are required and known to be applicable to this model and type of elevator.
  • Contractor shall furnish a written report of any deficiencies, the repair of which is necessary to ensure maintenance of adequate safety factors in accordance with identified standards.
  • Contractor shall give the Park Manager or designated representative at least forty-eight (48) hours advance notice prior to conducting regularly scheduled quarterly preventive maintenance visits.
  • Before leaving the facility, the technician must provide a verbal summary of work performed and leave a written service ticket detailing all completed maintenance, repairs, or identified deficiencies.
  • In accordance with ASME A17.1 Section 8.6, Contractor shall maintain a physical On-Site Maintenance Control Program (MCP) logbook located inside the elevator machine room for review by State of Utah Labor Commission inspectors.
  • Contractor must be available for emergency callback services on a twenty-four (24) hour day, seven (7) days per week basis and able to arrive on-site within eight (8) hours for urgent/entrapment-related incidents and within twenty-four (24) hours for standard non-urgent operational outages from the time of receiving notice from the Park Manager or designated park employee.

Additional information

Length of Contract: 5 years.

Vendor must guarantee its pricing for 1 Year.

Mandatory Site Visit: NO.

The methodology or formula that will be used to determine the number of contract awards is: Lowest Cost.

All questions must be submitted through U3P during the question and answer period. Answers from the State will be posted on U3P.

The Standard Terms and Conditions will not be negotiated. A bid that contains exceptions and/or additions to the Standard Terms and Conditions will be rejected and disqualified from this IFB.

The bid opening will NOT take place in person, unless otherwise asserted herein.

The Contractor shall maintain the following insurance coverage: workers' compensation insurance; commercial general liability insurance of no less than one million dollars ($1,000,000.00) per person per occurrence and three million dollars ($3,000,000.00) aggregate; and commercial automobile liability insurance with a minimum liability limit of $1 million per occurrence, combined single limit.

Documents

4 files

Subscribe to get these 4 documents.

  • Attachment A-Agency Terms and Conditions.docx
    Download
  • Attachment B Scope of Work.docx
    Download
  • Attachment C- Pricing Table.docx
    Download
  • Vendor Prerequisites - IFB Agency.pdf
    Download

Similar open bids

In Utah

More from Utah Division of State Parks

Open bids