Service Agreement for County-Wide HVAC Control System

Active DC2026-08 RFPFacilities & JanitorialDavis County
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Davis County (Utah) posted this RFP on Nov 18, 2026. Responses are due Dec 21, 2026. Category: Facilities & Janitorial. Questions are due 2026-12-09 16:00. Solicitation number DC2026-08.

Solicitation details

General information

Solicitation number
DC2026-08
Notice type
RFP
Place of performance
Utah
Questions due
2026-12-09 16:00

Agency and category

Agency
Davis County
Category
014Facilities & Janitorial
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Davis County (the “County”) is seeking comprehensive, competitive proposals from qualified Building Automation Systems (BAS) contractors (the “Vendor”). The selected vendor must deliver a dual-scope solution: executing a comprehensive service agreement for existing infrastructure utilizing the Alerton Compass system (the “System”) while operating as the prime automation contractor or Master System Integrator (MSI) to install, build, and integrate new construction and retrofit projects.

The core objective is to create and maintain maximum operational efficiency and ensure seamless expansion of the unified county-wide Alerton HVAC controls automation system.

The County’s current existing Alerton BAS consist of 16 buildings, 690 Devices, 6 subnets, and the Compass server has a XL license.

Scope

Multi-Year Service Agreement

The Vendor must be willing to enter into a multi-year agreement to provide the following:

  • System Maintenance & Updates: Perform scheduled software patching, database optimization, and firmware and version upgrades to keep the System secure and operational.
  • On-Call Support & Service: Provide rapid-response diagnostic support, sensor calibration, hardware troubleshooting, and emergency field service for all connected mechanical system through remote access or on-site work.
  • Performance Analytics & Continuous Monitoring: Install, deploy, maintain, and actively utilize an advanced automated building analytics platform. [...] providing monthly actionable reports to the County.
  • Update Current County HVAC Control System: Review existing system operation and sequencing to identify errors and flaws and correct any inefficiencies. [...] Ensure all components in the System are communicating and responding correctly.
  • Training: Provide training to County personnel upon the completion of new projects or major system modifications.
  • Certification Requirements: Maintain an active authorized Alerton dealership status. Provide staff members that are factory certified by Alerton. [...]

New Project Deployment & Seamless Integration

The Vender must also be able to provide the following:

  • Software Construction: Build, program, and commission custom Alerton Compass software databases, sequence of operations scripts, and dynamic graphical user interfaces from engineering plans for all new County projects. Provide the County with access to the software to continuously monitor and manage the System throughout the County.
  • County Specification & Standard: All new capital or retrofit projects must be built strictly to native BACnet architecture standards, utilizing peer-to-peer network topologies that strictly match the County’s hardware profile specifications. No proprietary third-party gateways will be accepted. [...]
  • Existing System Fusion: Fully integrate all new construction nodes, graphics, and controllers directly into the County’s centralized, existing System host server without disrupting active operations.

Additional information

**Submission method:** Required: Submissions will be accepted through Bonfire at utah.bonfirehub.com. Proposals must be received by Davis County no later than **Monday, December 21, 2026, at 5:00 p.m. MT**. If you would like submit a proposal using a different method, please contact the Davis County Purchasing Manager at purchasing@daviscountyutah.gov to discuss alternative submission options.

Required items

  • Complete the *Written Claim of Business Confidentiality and Concise Statement of Reasons Supporting This Claim of Business Confidentiality* (Exhibit A), have it signed by an authorized representative, and submit it as the first substantive item in the proposal.
  • Complete the *Vendor Proposal Form* (Exhibit B).
  • Alerton factory certification copies, dedicated IT professional credentials, experience, and at least three (3), but no more than five (5) customer references.
  • A detailed description of the proposed project approach.
  • A firm, fixed total itemized breakdown of all projected recurring annual costs for a period of five (5) years, submitted in a separate document from the main proposal.

Failure to comply with the sequential organization requirement or failure to satisfy one or more of the proposal submission requirements may result in the rejection of a Vendor submitted proposal.

Evaluation criteria

| Criteria | Weight |
| --- | --- |
| Project Approach | 30% |
| Certifications and Credentials | 30% |
| Past Performance and Experience | 15% |
| Cost | 25% |

The committee may elect to ask certain Vendors to complete an oral interview or provide a demonstration before the committee.

**Insurance:** The County's standard contract requires commercial general liability insurance (each occurrence $1,000,000.00; general aggregate $2,000,000.00), automobile liability insurance with a combined single minimum limit of $1,000,000.00, and workers compensation and employers’ liability insurance as required by Utah law.

Vendors shall be registered with the Utah Department of Commerce, Division of Corporations and Commercial Code.

Documents

1 file

Subscribe to get this document.

  • HVAC Controls RFP Final 11.17.26.pdf
    Download

Similar open bids

In Utah