City of St. George (Utah) posted this IFB on Nov 23, 2026. Responses are due Dec 8, 2026. Category: Parks & Recreation. Solicitation number 26-312.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of St. George is requesting bids to prepare Vernon Worthen Park Playground for new safety surfacing.
The work consists of the following base bid items:
| Item | Description | Qty | Unit |
| --- | --- | --- | --- |
| 1 | Mobilization | 1 | Lump |
| 2 | Environmental Protection | 1 | Lump |
| 3 | Traffic Control | 1 | Lump |
| 4 | Excavation of Road Base | 10,250 | SQ FT |
| 5 | Remove Existing Subgrade | 130 | CY |
| 6 | Remove and Reprocess 12" Subgrade and Compact to 95% | 380 | CY |
| 7 | 4" Untreated Base Course | 130 | CY |
| 8 | 4" Concrete Slurry | 130 | SQ FT |
Construction area needs to be fenced off with 6' tall chain link panels.
The Contractor shall prepare and submit a Storm Water Pollution Prevention Plan (SWPPP) to the Engineer for review and approval prior to the start of construction.
Includes all costs to design and provide a City approved Traffic Control Plan before construction.
**Every BID shall be accompanied by a bid bond in the amount of 5% of the BID**, naming the City of St. George as obligee, this bid bond must be issued by a surety company licensed to do business in the State of Utah and be on a bond form acceptable to the City of St. George.
All bid items shown on the Bid Schedules are considered to be deductible bid items. The OWNER, in consultation with the ENGINEER, shall remove bid items as required to meet the construction budget. The low bid shall be considered to be that bid which has the lowest total cost on the bid items selected by the OWNER for inclusion in the final Agreement rather than the total cost of all bid items prior to the elimination of various deductible alternate bid items.
The Owner reserves the right to increase or decrease the quantities listed in the Bid Schedules by up to 25%, or to entirely eliminate certain Bid Items from the work or materials, if found desirable or expedient.
The Bid price for Mobilization shall not exceed 10% of the total Bid price.
The City of St. George reserves the right to reject any or all PROPOSALS or to waive any formality or technicality in any PROPOSAL in the interest of the city.