Utah County (Utah) posted this ITB on Nov 16, 2026. Responses are due Dec 4, 2026. Category: Construction - Building. Questions are due 2026-11-25. Solicitation number ITB 2026-19.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Through this Invitation to Bid (ITB), Utah County intends to select a qualified contractor to provide for the construction and completion of a concrete cast-in-place drinking water well house equipped with a submersible 10 HP pump located in Utah County that meet in every detail, the specifications and “Lincoln Beach Well House #3” plans, herein referred to as (the Drawings), included in or referenced in this ITB.
The Contractor shall furnish all labor, materials, transportation, tools, equipment, supplies, disposal fees, and other costs required to complete the work in accordance with the terms hereof.
Pursuant to this ITB an agreement will be executed, a sample copy of which is attached as *Exhibit C*. The County will not entertain changes to its Standard Terms and Conditions.
The Contractor shall furnish all labor, materials, transportation, tools, equipment, supplies, disposal fees, and other costs required to complete the work in accordance with the terms hereof.
The completion date for the Lincoln Beach Well House #3 is on or before July 31, 2027, regardless of weather conditions and other related problems.
The Contractor shall be responsible for all construction staking.
The Contractor shall be responsible to protect in place all utilities shown or not shown on this plan.
The Contractor shall be responsible for providing all water, power, sanitary facilities, and telephone services as required for the Contractor’s use during construction.
Testing or work to determine contract compliance shall be performed by the Contractor. Such testing shall comply with American Public Works Association (APWA) standards for all applicable materials and placement of those materials. Copies of test results must be provided to, and approved by, the County Project Manager prior to final acceptance of project.
Submission method
Each respondent must submit its proposal digitally through the U3P website using the State of Utah’s Bonfire (EUNA) account. The proposal must be submitted by **Friday, December 4, 2026, at 3:00pm**.
Documents to submit with the bid
Evaluation
All bids will be evaluated by authorized representatives of Utah County for compliance with the terms and conditions contained in this ITB, and the resulting agreement awarded to the lowest responsive and responsible bidder.
Bonds
A performance bond satisfactory to County in an amount equal to **100%** of the price specified in the contract [...]. A payment bond satisfactory to the County in an amount equal to **100%** of the price specified in the contract [...].
Liquidated damages
The Contractor will pay Utah County **$1,000.00** per day for each calendar day between the Completion Date and the date of final acceptance.