DFCM Construction - Request for Statement of Qualifications Open-Ended Stage I Prequalification of Contractors for DFCM-Managed and Public School Construction Projects

Active CS27031 RFSQConstruction - BuildingUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this RFSQ on Nov 12, 2026. Responses are due Dec 17, 2026. Category: Construction - Building. Questions are due 2026-12-09 15:00. Solicitation number CS27031.

Solicitation details

General information

Solicitation number
CS27031
Notice type
RFSQ
Place of performance
Utah
Questions due
2026-12-09 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

This Open-Ended Stage 1 Request for Statement of Qualifications for Prequalification (RFSQ) is issued for new contractors interested in bidding on Stage II DFCM-managed projects, as well as performing work for any public school construction projects in Utah.

This prequalification will result in a DFCM maintained list of prequalified electrical, fire protection system, general, Hazmat, HVAC/mechanical, plumbing, paving, and roofing Contractors approved for participation in DFCM-managed project procurements and public school construction procurements.

Scope

Each Contractor seeking prequalification is required to submit a Statement of Qualifications (SOQ) "proposal". [...] Contractors seeking prequalification must indicate all construction trades for which they are seeking prequalification on the Contractor Information Form which is required as part of their SOQ proposal. The prequalified trades are as follows:

  • Electrical Contractor
  • General Contractor
  • Fire Protection Systems Contractor
  • Hazmat Contractor
  • HVAC/Mechanical Contractor
  • Paving Contractor
  • Plumbing Contractor
  • Roofing Contractor
  • Site/Civil Contractor

**Required** SOQ proposal documents:

  • *DFCM Contractor Information Form*
  • *DFCM Contractor Statement of Qualifications and Experience Form*. This form is required for EACH trade prequalification is being applied for.
  • Letter of Bondability from the Contractor's Surety with a Power of Attorney
  • Active State of Utah DOPL Contractor License
  • *DFCM Termination or Debarment Certification Form*
  • *DFCM Performance References Form*

Additional information

Contractors are solely responsible for ensuring that submission of their SOQ proposal in U3P is complete no later than the date and time specified on the Solicitation Schedule. U3P WILL NOT allow Contractors to submit documents after the date and time specified on the Solicitation Schedule.

DFCM will prequalify all responsive and responsible Contractors receiving an overall minimum score of 80 points, who have received a minimum of 20 Past Performance References points, and who have met all requirements listed within this solicitation.

| Selection Criteria | Points |
| --- | --- |
| Statement of Qualifications and Experience | 80 |
| Past Performance References | 20 |
| Total Possible Points | 100 |

Each Contractor prequalified under this Request for Statement of Qualifications will have a prequalified status effective date of February 1, 2027 valid for a period of 18 months. All contractors must recertify prior to their expiration date or their prequalification status will be revoked.

A mandatory meeting will be held on the date and time, and at the location specified on the Solicitation Schedule. All Contractors wishing prequalify must attend this meeting in its entirety and sign in to show proof of attendance.

Documents

17 files

Subscribe to get these 17 documents.

  • 1-CS27031-Request for Statement of Qualifications for Prequalified Contractors
    Download
  • 11.9.26.pdf
    Download
  • 2-CS27031--Stage I Prequalification
    Download
  • Documents Checklist.pdf
    Download
  • 3-CS27031-Stage 1 Contractor Prequalification - Contractor Information Form.pdf
    Download
  • 3H-CS27031-Stage I Prequalification
    Download
  • Hazmat Contractor Information Form.pdf
    Download
  • 4-CS27031-Contractor Prequalification
    Download
  • Statement of Qualifications and Experience Form.pdf
    Download
  • 5-CS27031-Contractor Prequalification
    Download
  • DFCM Performance References Form.pdf
    Download
  • 6-CS27031-DFCM Termination or Debarment Certification Form.pdf
    Download
  • 7-CS27031-Letter of Bondability Requirements.pdf
    Download
  • 8H-CS27031-Stage I Prequalification
    Download
  • Hazmat Contractor Acknowledgement Form.pdf
    Download
  • 9-DFCM Stage II Prequalified Bidding Process
    Download
  • 8.20.26.pdf
    Download

Similar open bids

In Utah

More from Utah Division of Facilities Construction and Management

Open bids