Utah Division of Facilities Construction and Management (Utah) posted this RFSQ on Nov 12, 2026. Responses are due Dec 17, 2026. Category: Construction - Building. Questions are due 2026-12-09 15:00. Solicitation number CS27031.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This Open-Ended Stage 1 Request for Statement of Qualifications for Prequalification (RFSQ) is issued for new contractors interested in bidding on Stage II DFCM-managed projects, as well as performing work for any public school construction projects in Utah.
This prequalification will result in a DFCM maintained list of prequalified electrical, fire protection system, general, Hazmat, HVAC/mechanical, plumbing, paving, and roofing Contractors approved for participation in DFCM-managed project procurements and public school construction procurements.
Each Contractor seeking prequalification is required to submit a Statement of Qualifications (SOQ) "proposal". [...] Contractors seeking prequalification must indicate all construction trades for which they are seeking prequalification on the Contractor Information Form which is required as part of their SOQ proposal. The prequalified trades are as follows:
**Required** SOQ proposal documents:
Contractors are solely responsible for ensuring that submission of their SOQ proposal in U3P is complete no later than the date and time specified on the Solicitation Schedule. U3P WILL NOT allow Contractors to submit documents after the date and time specified on the Solicitation Schedule.
DFCM will prequalify all responsive and responsible Contractors receiving an overall minimum score of 80 points, who have received a minimum of 20 Past Performance References points, and who have met all requirements listed within this solicitation.
| Selection Criteria | Points |
| --- | --- |
| Statement of Qualifications and Experience | 80 |
| Past Performance References | 20 |
| Total Possible Points | 100 |
Each Contractor prequalified under this Request for Statement of Qualifications will have a prequalified status effective date of February 1, 2027 valid for a period of 18 months. All contractors must recertify prior to their expiration date or their prequalification status will be revoked.
A mandatory meeting will be held on the date and time, and at the location specified on the Solicitation Schedule. All Contractors wishing prequalify must attend this meeting in its entirety and sign in to show proof of attendance.
Subscribe to get these 17 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.