DFCM Construction - Prequalified Electrical Stage II - Administrative Office of the Courts - Logan Courts Fire Alarm Replacement - Project #27059150

Active CS27030 ITBConstruction - BuildingUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this ITB on Nov 12, 2026. Responses are due Dec 9, 2026. Category: Construction - Building. Questions are due 2026-12-01 15:00. Solicitation number CS27030.

Solicitation details

General information

Solicitation number
CS27030
Notice type
ITB
Place of performance
Utah
Questions due
2026-12-01 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids from Stage II Prequalified Electrical Contractors for Construction services for the following project. Contractors not prequalified through the Stage I Request for Statement of Qualifications process are not eligible to bid on this project.

**Logan Courts Fire Alarm Replacement** - Administrative Office of the Courts, 135 N 100 W Logan, Utah 84321. DFCM Project #27059150 | U3P Reference # CS27030 | Project Manager: Carl Francis

Brief Project Description: Replacement of the fire alarm system.

Construction Budget: **$220,000.00**

Scope

Replacement of the fire alarm system including the panel, all notification devices, and wiring.

**Additive Alternates:** N/A

Project Requirements:

  • DFCM Approved Fabricator List
  • DFCM Design Management Documents
  • DFCM Roofing Design Requirements
  • State of Utah High Performance Building Standard and all appendixes

Substantial Completion Date: June 7, 2027. Liquidated Damages: $200.00 per day.

Additional information

Bids must be submitted via the U3P website no later than the time and date specified on the Solicitation Schedule. Contractors attempting to submit a bid through U3P website after the bid deadline has passed will not be successful and therefore disqualified from consideration of award of this project.

A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 – 2010 Bid Bond form in the amount of **5% of the bid**, or equivalent, must accompany the bid submitted within U3P. If the bid bond is not provided with the bid, the bid is nonresponsive, and the Contractor may be disqualified from the selection process.

All Contractors are required to submit their *DFCM Subcontractors List Form* to dfcmcontracts@utah.gov by **Thursday, December 10, 2026, 3:00 PM**. If the form is not provided by the time and date specified, the bid is nonresponsive.

The contract award will go to the Contractor submitting the lowest responsive and responsible bid.

Before submitting a bid, the Contractor shall carefully examine the solicitation; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in their bid the cost of all items required by the solicitation.

Documents

8 files

Subscribe to get these 8 documents.

  • 1-CS27030-27059150-Solicitation.pdf
    Download
  • 2-CS27030-27059150-Approved Plans.pdf
    Download
  • 3-CS27030-27059150-Approved Specs.pdf
    Download
  • 4-CS27030-27059150-Hazmat Survey.pdf
    Download
  • A-DFCM General Conditions August 2020-Clean rev 07122023.pdf
    Download
  • B-Subcontractors List Form Instructions-7.1.2021.docx
    Download
  • C-DFCM Health Insurance Statement of Compliance Form
    Download
  • Revised 7.28.25.docx
    Download

Similar open bids

In Utah

More from Utah Division of Facilities Construction and Management

Open bids