Lake Mountain School District (Utah) posted this RFP on Nov 18, 2026. Responses are due Dec 10, 2026. Category: Construction - Building. Questions are due 2026-12-01 17:00. Solicitation number LMSD12102026CS.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Lake Mountain School District (the "District") is seeking a progressive design-build team (the "DB Team") to design and build a new Bus Maintenance & Transportation Facility of about 21,600 gross square feet in Saratoga Springs, Utah.
The selected team works with the District under one agreement in two contract phases:
Selection is a single-stage, value-based process. Each team submits one proposal covering its qualifications, Design Phase approach, and fees. Interviews are optional.
The DB Team designs the entire building and site, then builds:
The DB Team holds single-point responsibility, under one agreement in two contract phases, for:
The Design Phase is paid as a not-to-exceed fee. The DB Team:
Construction is under the GMP, and savings are returned to the District. The Construction Phase also includes:
**Submission method:** All submittals are uploaded through the Utah Public Procurement Place (U3P). Late submittals are not accepted. Proposals still uploading at the posted closing time will not be accepted, so allow enough time to finish.
All communication goes in writing, through U3P, to the Procurement Officer.
*Schedule C, Fee Proposal Form*, issued as a separate document and uploaded separately as the sealed fee submission.
A **mandatory** pre-submittal meeting and site walk will be held. The prime contractor and the prime architect must each have an authorized representative present for the entire meeting and must sign the attendance log.
Proposals remain valid for 90 days after the due date.
Teams propose their own construction duration within 6 to 9 months. Shorter credible durations score higher.
The District appoints an Evaluation Committee of at least three members under the Utah Procurement Code. Interviews are optional.