Lake Mountain School District Design-Build Services: Bus Maintenance & Transportation Facility

Active LMSD12102026CS RFPConstruction - BuildingLake Mountain School District
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Lake Mountain School District (Utah) posted this RFP on Nov 18, 2026. Responses are due Dec 10, 2026. Category: Construction - Building. Questions are due 2026-12-01 17:00. Solicitation number LMSD12102026CS.

Solicitation details

General information

Solicitation number
LMSD12102026CS
Notice type
RFP
Place of performance
Utah
Questions due
2026-12-01 17:00

Agency and category

Agency
Lake Mountain School District
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Lake Mountain School District (the "District") is seeking a progressive design-build team (the "DB Team") to design and build a new Bus Maintenance & Transportation Facility of about 21,600 gross square feet in Saratoga Springs, Utah.

The selected team works with the District under one agreement in two contract phases:

  • Design Phase. The design and cost are developed together, ending in a Guaranteed Maximum Price ("GMP").
  • Construction Phase. Construction under that GMP.

Selection is a single-stage, value-based process. Each team submits one proposal covering its qualifications, Design Phase approach, and fees. Interviews are optional.

Scope

The DB Team designs the entire building and site, then builds:

  • the complete building shell, including the future CTE areas: foundations, slab, structure, roof, envelope, overhead doors, and exterior finishes that meet City standards;
  • full fit-out of all District operational spaces (see Facility Space Program);
  • building-wide fire protection, fire alarm, and base utility service sized for the full building at CTE build-out;
  • site, utility, fencing, security, and telecommunications work for the building and its immediate apron; and
  • rough-ins, stub-outs, and capped connections, so the future CTE phase can proceed without demolishing this project's work.

The DB Team holds single-point responsibility, under one agreement in two contract phases, for:

  • design, approvals, construction, commissioning, and closeout of this project; and
  • schematic design of the future CTE phase.

The Design Phase is paid as a not-to-exceed fee. The DB Team:

  • validates the program with the District and delivers a layout and program-fit study first;
  • develops the design through schematic design (SD), design development (DD), and construction documents (CDs), with an open-book cost model updated at each milestone;
  • leads design meetings, estimating, scheduling, constructability reviews, and lifecycle-cost value engineering;
  • prepares City and DFCM submittals and the non-binding CTE phase estimate;
  • competitively bids subcontracts under the Utah Procurement Code, with the District observing;
  • proposes early work packages (foundations, steel, long-lead items) for District approval by amendment; and
  • submits a GMP proposal at about 90% CDs.

Construction is under the GMP, and savings are returned to the District. The Construction Phase also includes:

  • commissioning of HVAC, exhaust, compressed air, fluid distribution, fire protection, fire alarm and intrusion integration, and controls;
  • staff training;
  • as-builts (PDF and CAD/Revit), O&M manuals, and warranties; and
  • a closed punch list.

Additional information

**Submission method:** All submittals are uploaded through the Utah Public Procurement Place (U3P). Late submittals are not accepted. Proposals still uploading at the posted closing time will not be accepted, so allow enough time to finish.

All communication goes in writing, through U3P, to the Procurement Officer.

*Schedule C, Fee Proposal Form*, issued as a separate document and uploaded separately as the sealed fee submission.

A **mandatory** pre-submittal meeting and site walk will be held. The prime contractor and the prime architect must each have an authorized representative present for the entire meeting and must sign the attendance log.

Proposals remain valid for 90 days after the due date.

Teams propose their own construction duration within 6 to 9 months. Shorter credible durations score higher.

The District appoints an Evaluation Committee of at least three members under the Utah Procurement Code. Interviews are optional.

Documents

9 files

Subscribe to get these 9 documents.

  • Confidentiality Claim Form.pdf
    Download
  • LMSD BMF PDB RFP-2.pdf
    Download
  • LMSD TERMS AND CONDITIONS 5.9.25.pdf
    Download
  • LMSD12102026CS Schedule B - Technical Proposal.pdf
    Download
  • SCHEDULE “A” — CERTIFICATION OF PROPOSAL (1).pdf
    Download
  • SCHEDULE “C” — TURNKEY COST VALUE PRICING.pdf
    Download
  • Site Plan Layout.jpg
    Download
  • Vendor Prerequisites for RFP LMSD.pdf
    Download
  • West Transportation Utility Plans.pdf
    Download