SLCo FAC134232 Adult Detention Center Roof Top Unit Replacement - CONST

Active Bonfire-e56565d7 IFBConstruction - BuildingSalt Lake County
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Salt Lake County (Utah) posted this IFB on Nov 18, 2026. Responses are due Dec 17, 2026. Category: Construction - Building. Solicitation number Bonfire-e56565d7.

Solicitation details

General information

Solicitation number
Bonfire-e56565d7
Notice type
IFB
Place of performance
Utah

Agency and category

Agency
Salt Lake County
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

To replace all the RTU's as per the plans and specs.

The Work includes all of the work of Divisions 01 thru 33 for the SL Co Adult Detention Center Jail Roof Top Unit Replacement - Phase 6-12. Location: 3415 South 900 West, South Salt Lake, Utah 84119.

Project will be constructed under a single prime contract.

Scope

Construction shall be performed in phases. One phase shall be completed and operated before starting the next phase. Construction schedule shall be approved by the Project Manager and ADC prior to proceeding the work. Don't shut down RTU serving Cells and Dayroom for the same Housing Pod Unit at the same time; maintain one RTU function in place for each Housing Pod Unit during each phase.

The order of construction area: Housing Pod C, Housing Pod D, Housing Pod A, Jail Support will be the last area.

Contractor to provide temporary cooling, heating and ventilation that maintains temperature between 68 deg. – 80 deg.

Alternates

  • Alternate No. 1 - Five-Year Service and Maintenance Agreement. Provide a firm-priced, five-year Service and Maintenance Agreement for the packaged rooftop air-handling units identified in Section 23 0100, Article 1.3.
  • Alternate No. 2 - Building Automation System – See narrative at the end of this section.

Additional information

Security

As a condition of bidding this project, all employees of the General Contractor, employees of all Sub-Contractors, material suppliers, delivery personnel, and all others directly involved in the execution of this project shall submit to a security screening. No person shall be on site who has not received a background security clearance.

The Drawings and the Specifications shall be interpreted as equals. If conflicts arise between the Drawings and the Specifications, and are not clarified in the addenda, then the Bidder is to bid the more expensive interpretation, and complete the work within the original contract time.

This form must be included in your bid package as part of the required forms for submittal. The County reserves the right to investigate further, any of the responses to the above questions.

Proposer must answer all questions on the *Contractor Responsibility Questionnaire* or the Proposer may be deemed non-responsive and/or non-responsible.

Documents

13 files

Subscribe to get these 13 documents.

  • -1- Instructions to Bidders- FAC134232 Adult Detention Center Roof Top Unit Replacement.pdf
    Download
  • -2- 1.4 Section 2 Document 1.0 Offer and Cover Summary.docx
    Download
  • -3- 1.4 Section 2 Document 3.0 Schedule of Values.xlsx
    Download
  • -4- 1.4 Section 2 Document 5.0 Sub-Contractors Modified-.docx
    Download
  • -5- 1.4 Section 3 Construction Agreement Version 31March2023.docx
    Download
  • -6- 1.4 Section 4 General Terms Version 31March2023.pdf
    Download
  • -7- Exhibit A- Contractor Responsibility Questionnaire- FAC134232.pdf
    Download
  • -8- Exhibit B- Construction Project Reference Form.pdf
    Download
  • -9- Exhibit C- Security Access Application and Instructions..pdf
    Download
  • 10- 3.26 Apprenticeship Utilzation Ordinance.pdf
    Download
  • 11- 3.27 Const Procurement Min Standards Ordinance.pdf
    Download
  • 12- Specifications- FAC134232 Adult Detention Center Roof Top Unit Replacement.pdf
    Download
  • 13- Plans- FAC134232 Adult Detention Center Roof Top Unit Replacement.pdf
    Download