Neighborhood House- Rear Building Access Improvement

Active RA27-132 IFBConstruction - BuildingNeighborhood House
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Neighborhood House (Utah) posted this IFB on Oct 27, 2026. Responses are due Nov 19, 2026. Category: Construction - Building. Questions are due 2026-11-12 17:00. Solicitation number RA27-132.

Solicitation details

General information

Solicitation number
RA27-132
Notice type
IFB
Place of performance
Utah
Questions due
2026-11-12 17:00

Agency and category

Agency
Neighborhood House
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Neighborhood House proposes to improve the rear side of its facility by constructing an accessible route through the existing curb and landscape area and installing a new gate with panic hardware. The project is intended to remove a physical barrier, improve safe movement through the rear area, and provide a more usable route for participants, caregivers, visitors, and staff with mobility needs.

Neighborhood House serves children and adults at 1050 West 500 South in Salt Lake City.

Scope

This plan includes removal and restoration of landscaping, curb demolition, concrete installation, gutter grinding, a gate with panic hardware, temporary security, architectural plans, permit allowance, project supervision and coordination, debris removal, cleanup, and contingency.

  • Planning and field verification: Confirm existing grades, drainage, gate location, route width, adjacent obstacles, utility conflicts, gate swing, egress function, and security requirements.
  • Design and permit documents: Prepare and submit architectural plans and supporting information required for Salt Lake City review. Revise documents as required by the authority having jurisdiction.
  • Site preparation and protection: Establish the work area, protect adjacent operations, remove affected bushes and landscape materials, and install a temporary security wall or barrier.
  • Demolition and grading: Sawcut and remove the affected curb and concrete. Prepare the base and grades for the approved accessible route.
  • Concrete and transition work: Place new concrete, form the approved curb or ramp transitions, finish surfaces for slip resistance, and grind the top of the gutter where required for a safe transition.
  • Gate installation: Provide and install the new gate with panic hardware. Final gate width, hardware height, maneuvering clearance, opening force, closing behavior, and swing will follow the approved plans and applicable life-safety requirements.
  • Restoration and closeout: Haul off debris, complete construction cleanup, restore affected landscaping, obtain final inspection approval, and deliver closeout documentation.

Additional information

Bids are to be submitted through U3P/Bonfire no later than November 19, 2026 at 5:00 PM.

Contractors must include a proposed project schedule with their bids, covering design, permitting, construction, inspections, and final completion.

The contract is to be awarded to the lowest responsible and responsive bidder, whose bid meets the requirements and criteria set forth in the document *PY25 Pre-Bid Orientation.Prime Contractor Compliance Checklist*.

This project is funded through the Community Development Block Grant (CDBG) Program administered by Salt Lake County and is subject to applicable federal labor standards, including the Davis-Bacon and Related Acts (DBRA). The selected contractor and all subcontractors must comply with the applicable federal prevailing wage requirements.

A **mandatory** pre-construction meeting with Salt Lake County will be required after contract execution and before any construction work begins.

To lock this Wage Determination, the contract must be signed within 90 days.

Documents

3 files

Sign up free to get these 3 documents.

  • FINAL RFB Neighborhood House ADA Gate Project Plan (1).pdf
    Download
  • NH Wage Determination Building 10-22-2026 (1).pdf
    Download
  • PY25 Pre-Bid Orientation.Prime Contractor Compliance Checklist (1).pdf
    Download

Similar open bids