NS27-138 Smithfield City - Springline Replacement - Phase 2

Active NS27-138 IFBConstruction - Heavy & CivilSmithfield City
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Smithfield City (Utah) posted this IFB on Nov 12, 2026. Responses are due Dec 16, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-12-10 12:00. Solicitation number NS27-138.

Solicitation details

General information

Solicitation number
NS27-138
Notice type
IFB
Place of performance
Utah
Questions due
2026-12-10 12:00

Agency and category

Agency
Smithfield City
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Smithfield City (Owner) is requesting Bids for the construction of the following Project:

Springline Replacement – Phase 2

The project consists of installation of a new 12” HDPE waterline along canyon road from the end of phase 1 to the last spring on the system. The existing springs along the project length will be tied into the new line.

Scope

The project consists of installation of a new 12” HDPE waterline along canyon road from the end of phase 1 to the last spring on the system. The existing springs along the project length will be tied into the new line.

Additional information

Bids for the construction of the Project will be received at the Smithfield City Offices located at 96 S. Main, Smithfield, UT 84335, until **December 16, 2026, at 2:00 p.m. local time**. Bids will be publicly opened and read aloud at that time.

Electronic Copies (pdf format) of the Contract Documents will be available on November 17, 2026 and may be obtained at www.jub.com – select “plans” tab at the top of the page – download fees apply. Addendum details and plan holder lists will be posted under the project in the same location.

A **mandatory** pre-bid conference will be held at 1:00 p.m. prevailing local time December 1, 2026, at Smithfield City offices.

Documents

1 file

Subscribe to get this document.

  • 03 C111 Ad for Bids for Const Contract 2018.docx
    Download

Similar open bids

In Utah