Provo Water Reclamation Facility Administration and Collections Buildings Project

Active PR2026001042 RFPConstruction - BuildingCity of Provo
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Provo (Utah) posted this RFP on Oct 26, 2026. Responses are due Nov 24, 2026. Category: Construction - Building. Questions are due 2026-11-12. Solicitation number PR2026001042.

Solicitation details

General information

Solicitation number
PR2026001042
Notice type
RFP
Place of performance
Utah
Questions due
2026-11-12

Agency and category

Agency
City of Provo
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Provo City Water Resources Division is a division with the Public Works Department of Provo City (City). Water Resources is responsible for both water supply and distribution and wastewater collection and treatment. The City is seeking a specialty building construction manager/general contractor (CM/GC) to provide preconstruction services for the Provo City Water Reclamation Facility (PCWRF) Administration and Collections Buildings Projects located at the site of the existing Water Reclamation Facility.

The total price for preconstruction and construction services is currently budgeted at **$12 million dollars**.

Scope

Preconstruction Services

  • Develop the Project Management Plan and attachments including a Project Risk Management Plan, Packaging/Phasing Plan and Subcontracting Plan
  • Attend Project meetings and workshops
  • Review and finalize the General Conditions for the Project and the Construction Services Agreement
  • Perform constructability reviews, biddability reviews and value engineering, on design development submittals in conjunction with the City and Design Professional.
  • Prepare and maintain a Project cost model and submit detailed, open-book cost estimates as the design is advanced.
  • Prepare and maintain a Project schedule and submit updates as the design is advanced.
  • Identify Project permitting requirements and determine when certain permitting activities should be initiated.
  • Submit and negotiate a GMP proposal for the Project.

Construction Services

  • Construct the Project.
  • Secure necessary construction permits.
  • Mitigate Project risks.
  • Procure and manage equipment and subcontractors.
  • Self-perform at least 50 percent of the Project scope, as approved by the City.
  • Conduct startup, commissioning and performance testing.
  • Provide Owner training for building systems.
  • Provide warranty coverage for constructed work.

Additional information

This Request will be posted on the State of Utah's Procurement portal (BonFire). Questions regarding this request must be submitted online at: https://utah.bonfirehub.com/portal/?tab=openOpportunities

Proposals will be reviewed and evaluated using a best-value selection process described in Section 6.

Attendance at the Pre-Proposal meeting is **mandatory**.

It is anticipated that the CM/GC Preconstruction Services Agreement will be executed on or about January 15, 2027.

  • RFP issued: October 26, 2026
  • Final date to submit questions: **November 12, 2026**
  • Final addenda issued: November 17, 2026
  • Proposal due date: **November 24, 2026**
  • Shortlist notification - Tentative: December 3, 2026
  • Oral interview - If required: December 17, 2026
  • Selection notification - Tentative: December 21, 2026

Documents

7 files

Sign up free to get these 7 documents.

  • 01 - CMGC Documents.pdf
    Download
  • 02 - Geotechnical Report.pdf
    Download
  • 03 - Micropile Foundation Design Package.pdf
    Download
  • 04 - A-AD-112 Administration Building First Floor Plan.pdf
    Download
  • 05 - A-AD-122 Administration Building SecondFloor Plan.pdf
    Download
  • 06 - A-CO-101 Collection Building Plan.pdf
    Download
  • 07 - A-MS-100 Administration and Collections Buildings Project Site Plan.pdf
    Download