Park City Municipal Corporation (Utah) posted this RFP on Oct 23, 2026. Responses are due Nov 20, 2026. Category: Facilities & Janitorial. Questions are due 2026-11-17 17:00. Solicitation number PCMC27042 - PW.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
PCMC is inviting proposals from qualified persons or firms (“Respondent”) to provide On-Call Plumbing and Drain Repair and Maintenance Services to PCMC on an as needed basis. Respondents may submit one or more services requested in the price list.
PCMC seeks to contract with a qualified vendor or vendors (“Respondent”) to provide professional on-call plumbing and drain repair and maintenance services for all PCMC properties. The City currently manages 24 municipal building facilities. The City currently handles standard preventative maintenance but requires professional contractors for specialized maintenance and complex repairs.
PCMC anticipates this solicitation will result in a multiple-award contract vendor pool.
Provide all labor, materials, equipment, and supervision necessary to complete plumbing and drain repair services across all PCMC properties.
Generally, Respondent will be responsible for providing all labor, materials, equipment, and supervision necessary to complete commercial plumbing and drain repair and maintenance services on as-needed basis.
Labor
Respondent is responsible for ensuring only qualified technicians perform labor for services requested by PCMC. PCMC must receive a certified statement from the Respondent attesting to the qualifications of each technician prior to performing work on City facilities.
Respondent must provide 24/7/365 emergency response capability with guaranteed response times outlined below:
Materials and Equipment
To maintain consistency, PCMC prefers OEM plumbing components to be used when applicable. [...] Equivalent alternative products require explicit written PCMC approval prior to use.
Respondent will provide explicit material markup percentage on provided price list.
Warranty
Respondent must provide the following warranties:
Maintenance Log
Respondent must consistently keep a maintenance log showing work performed for the City. Log must be prepared by service personnel at time of service and be provided to the designated Project Manager after each visit. PCMC reserves the right to review and confirm completed services prior to acceptance.
City Codes
All work must meet and conform to OSHA, IPC/UPC, IBC, IMC and IFGC codes.
Submit proposals electronically via Utah Public Procurement Place (“U3P”). The proposals will be opened after the submission deadline.
PROPOSALS DUE: By 5:00 p.m. on, Friday, November 20, 2026
Proposals will remain valid for 90 days after submission. Proposals are limited to 10 pages.
Contracts will be for a period of three (3) years, with the option to renew for two (2) additional one-year periods.
Evaluation criteria
The awards will go to all vendors in the competitive range based on score. NOTE: Price may not be the sole deciding factor.
**Required** documents: *Business Confidentiality Request Form*, copy of valid W-9, proof company is registered, or has applied for registration, to do business in Utah, and proof of insurance compliant with the requirements outlined in Exhibit “C”.
SITE INSPECTIONS: Respondent is encouraged to schedule in person inspections at each site listed in Exhibit “A” – PCMC Building and Facility Site Locations Map. The sites listed in Exhibit “A” must be viewed with City staff present.
Sign up free to get this document.