UDOT Region 1 Saleratus Creek Mitigation Site

Active UDOT270106CN IFBLandscaping & AgricultureUtah Department of Transportation
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Utah Department of Transportation (Utah) posted this IFB on Nov 17, 2026. Responses are due Dec 1, 2026. Category: Landscaping & Agriculture. Solicitation number UDOT270106CN.

Solicitation details

General information

Solicitation number
UDOT270106CN
Notice type
IFB
Place of performance
Utah

Agency and category

Agency
Utah Department of Transportation
Category
017Landscaping & Agriculture
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide services for Wetland mitigation at two sites located in Davis and Weber County. Sites require ongoing maintenance activities such as noxious and invasive weed control along with the potential for additional work items such as mowing, tree and shrub removal, reseeding and riparian plant replacement.

This contract may result in a multiple 5 year contracts. Award will be given to the lowest responsive and responsible bidder from the Cost sheet Attachment C.

The Utah Department of Transportation (UDOT), Region 1, has a stream and wetland mitigation site adjacent to SR-16 at Saleratus Creek near Woodruff, Rich County, Utah which will require ongoing maintenance activities such as noxious and invasive weed control along with the potential for additional work items such as mowing, reseeding and riparian plant replacement.

Scope

Extent of Work

Contractor shall provide all labor, materials, mileage, travel, mobilization and equipment costs to provide maintenance and vegetation control at following UDOT Region 1 wetland mitigation site.

  • MS0056 – SR-16, Saleratus Creek mitigation site
  • Location: 41.501685°, -111.123851°
  • Site Acreage: Approximately 5.094 acres: Upland Habitat = Approximately 0.50 acres; Wetland Habitat = Approximately 3.70 acres; Saleratus Creek channel = Approximately 0.90 acres/1,115 LF)
  • Contract Work will occur annually

Scope of Work Items

  • Target Plant Species (TPS) Control: Eradicate and control the spread of the following noxious and identified invasive weeds as part of TPS control.
  • Mowing: Herbaceous plants, including Phragmites australis, may be mowed to manage vegetation across the site. Tractor Mowing (per Acre); Walk-Behind Brush Mower (per Hour); Trimmer (per Hour).
  • Additional Work Items (only when requested by UDOT): Provide cost estimate for Re-seed Habitat Areas (per 1/10th Acre cost) and Riparian Plant Replacements (per Each).

Scope of Work General Requirements

  • Make as many trips as necessary to the mitigation site to complete contract work.
  • UDOT does not make any payments for contractor mobilization trips, mileage, fuel, lodging, etc.
  • Protect-in-Place any existing woody shrubs/trees, fences, gates, utility equipment and monitoring T-posts.
  • Coordinate with UDOT before storing and leaving equipment on site.

TPS Control Requirements

  • Provide an annual lump sum cost estimate for TPS control for the mitigation site based on acreage and habitat type.
  • Obtain UDOT approval of annual TPS control treatment plan and schedule before beginning work on site.
  • Minimum of 90% treatment control of TPS control is considered successful for this contract and will be used for payment purposes.
  • Notify UDOT a minimum of 7 calendar days before performing any work.
  • Begin treatment work at the site as early as May 1st based on site growing conditions and early TPS to treat.

Additional information

**Mandatory** pre-bid meeting is virtual only. Bidders must include a current Utah State pesticide applicators license with Aquatic (surface water) certification, at least 3 references, a proposed Annual Treatment Plan, and documentation of the GPS herbicide spray data logger system.

This is a requirements annual contract with a total possible length of five (5) years that can be terminated at any time within the contract time by either party (UDOT or Contractor). Both parties must agree, in writing, before December 31st of the current year to continue with the existing contract for the following season.

UDOT will use the TPS Control (Annual Lump Sum) bid provided by the bidding contractors to determine Low-Bid Estimate and Contract Award. Additional work item prices are for informational purposes only and will not be factored into the Low-Bid Estimate or contract award.

Payment #1 will include all work completed between April and end of June. Payment #2 will include all work completed between July and December 30th.

Contractor must maintain workers' compensation insurance, commercial general liability insurance of no less than **$1,000,000.00** per person per occurrence and **$3,000,000.00** aggregate, and commercial automobile liability insurance with a minimum limit of **$1 million** per occurrence if a vehicle is used.

Documents

4 files

Subscribe to get these 4 documents.

  • 7. Submittal Form- Vendor Set Up Form 2024-06-27 .pdf
    Download
  • Agency-Contract-GoodsServices-Combined-9.16.24 (2).docx
    Download
  • Attachment B Scope of work2027 Saleratus Creek Maintenance Scope of Work 26.11.17 (1).pdf
    Download
  • Attachment C Cost Sheet 2027 Saleratus Creek Maintenance Cost Sheet.xlsx
    Download

Similar open bids

In Utah

More from Utah Department of Transportation

Open bids