State Parks Project – Upper 290 Trail Rebuild at Mount Spokane State Park

Active EW-C29000 ITBConstruction - Heavy & CivilWashington State Parks and Recreation Commission
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Washington State Parks and Recreation Commission (Washington) posted this ITB on Nov 2, 2026. Responses are due Dec 15, 2026. Category: Construction - Heavy & Civil. Solicitation number EW-C29000.

Solicitation details

General information

Solicitation number
EW-C29000
Notice type
ITB
Place of performance
Washington

Agency and category

Agency
Washington State Parks and Recreation Commission
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The project purpose is to rebuild sections of the existing downhill mountain bike trail called Upper 290 Trail, located within the Mt. Spokane State Park.

Scope

The project includes the following work:

  • Installation and maintenance of temporary and permanent erosion and sediment control features.
  • Construction of mountain bike specific trail alignments and features in trail sections identified for improvement.
  • Decommissioning of existing trail to be retired and returned to a vegetative, undisturbed state.
  • Limited vegetation removal, including limited tree removal, for trail improvement areas.

EXISTING UPPER 290 TRAIL ALIGNMENT, AS INTERPOLATED FROM LiDAR IMAGERY, IS APPROXIMATELY 7,081 LF (1.34 MI) WITH 980 FT OF VERTICAL DROP. EXISTING TRAIL IS PROPOSED TO BE IMPROVED AND INCREASE IN LENGTH TO 7,240 LF (1.37 MI). THERE IS NO PROPOSED IMPROVEMENT OR CHANGE TO THE START OR END LOCATION OF THE EXISTING TRAIL AND THE VERTICAL DROP IS TO REMAIN THE SAME.

Additional information

TREE REMOVAL TO BE DETERMINED DURING PRE-BID CONSTRUCTION WALK.

Documents

4 files

Sign up free to get these 4 documents.

  • EW-C29000 Mt Spokane Upper 290 Rebuild-Bid Bond 2025.xlsx
    Download
  • EW-C29000 Mt Spokane Upper 290 Rebuild-Bid Proposal Form 2026.xlsx
    Download
  • EW-C29000 Mt Spokane Upper 290 Rebuild-drwgs.pdf
    Download
  • EW-C29000 Mt Spokane Upper 290 Rebuild-specs.pdf
    Download

Similar open bids

In Washington

More from Washington State Parks and Recreation Commission

Open bids