Washington State Parks and Recreation Commission (Washington) posted this ITB on Nov 2, 2026. Responses are due Dec 15, 2026. Category: Construction - Heavy & Civil. Solicitation number EW-C29000.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The project purpose is to rebuild sections of the existing downhill mountain bike trail called Upper 290 Trail, located within the Mt. Spokane State Park.
The project includes the following work:
EXISTING UPPER 290 TRAIL ALIGNMENT, AS INTERPOLATED FROM LiDAR IMAGERY, IS APPROXIMATELY 7,081 LF (1.34 MI) WITH 980 FT OF VERTICAL DROP. EXISTING TRAIL IS PROPOSED TO BE IMPROVED AND INCREASE IN LENGTH TO 7,240 LF (1.37 MI). THERE IS NO PROPOSED IMPROVEMENT OR CHANGE TO THE START OR END LOCATION OF THE EXISTING TRAIL AND THE VERTICAL DROP IS TO REMAIN THE SAME.
TREE REMOVAL TO BE DETERMINED DURING PRE-BID CONSTRUCTION WALK.