ProposalWorkspaceFederal OpportunitiesDepartment of Defense

Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT

Active FA461027R0001 Special NoticeTotal Small Business Set-Aside (FAR 19.5)Department of the Air Force
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

FA4610 30 Cons PK of Department of the Air Force posted this Special Notice on Nov 3, 2026. Responses are due Jan 31, 2027. NAICS 561210 (Facilities Support Services), product or service code Z1AZ (Maintenance of Other Administrative Facilities and Service Buildings). Set-aside: Total Small Business Set-Aside (FAR 19.5). Place of performance: California 93437. Solicitation number FA461027R0001.

Solicitation details

General information

Solicitation number
FA461027R0001
Notice type
Special Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Place of performance
California 93437

Classification

NAICS
561210Facilities Support Services
Product or service
Z1AZMaintenance of Other Administrative Facilities and Service Buildings

Agency

Department
Department of Defense
Sub-tier
Department of the Air Force
Office
FA4610 30 Cons PK

Description

From SAM.gov

*See Amendments section at the bottom for updates/amendments to this draft RFP.

This Special Notice provides interested parties with information regarding the availability of the draft Request for Proposal (dRFP), review requirements, the tentative acquisition schedule, and the upcoming Industry Day and Site Visit.

This notice is for planning purposes only and does not constitute an invitation for bids, request for proposals, or quotes, nor does it indicate that the Government will contract for the items described herein. The Government will not reimburse respondents for any costs associated with submitting feedback or attending the events outlined in this notice. 

The 30th Contracting Squadron (30 CONS/PKD) at Vandenberg Space Force Base (VSFB), CA, is requesting industry feedback on the dRFP for the Facility Readiness and Maintenance Execution (FRAME) contract. FRAME is the follow-on acquisition to the current Launch Operations Support Contract (LOSC) (Contract #FA4610-23-D-0001, currently performed by Call Henry, Inc.).  

FRAME follow-on acquisition is 100% Small Business Set-Aside. The North American Industry Classification System (NAICS) code for this effort is 561210 Facilities Support Services (small business size standard is $47M). 

Description of Services, Background, and Objective: FRAME is a non-personal services contract that provides maintenance, repair, modification, and modernization for over 130 facilities, property, and equipment (P&E) supporting the nation’s space mission, defense, and test activities at VSFB and its associated geographically-separated locations. 

The scope of work involves facility infrastructure and systems (including water and gas mains, roads, generators, power distribution, HVAC, waste systems, and roofing) alongside the execution of distinct sustainment projects and standby support for urgent repairs during select launch operations to ensure maximum operational readiness. Additionally, the contract encompasses the inspection, testing, and certification of all Space Launch Delta 30 cranes and elevators. A key change under this follow-on acquisition is that the South Vandenberg Power Plant (SVPP) is no longer a requirement and will not be carried over from the legacy LOSC to the new FRAME contract.  

The primary objective of the FRAME contract is to ensure Real Property Installed Equipment (RPIE) and facilities are maintained and operationally ready for a variety of ballistic missile, space, guided weapon, and aircraft test and evaluation missions in support of Space Launch Delta 30 (SLD 30), 30th Civil Engineer Squadron (30 CES), 4th Launch Squadron (4 LS), 2nd Range Operations Squadron (2 ROPS), Missile Defense Agency (MDA), U. S. Space Forces - Space (S4S), 18th Space Defense Squadron (18 SDS), Sentinel, 30th Operations Support Squadron (30 OSS), 2nd Space Launch Squadron (2 SLS), the National Reconnaissance Office (NRO), and various other Range Users. 

Mission Essential Services: The FRAME contract contains some mission-essential requirements which require continued support during peacetime, national emergency, and/or wartime scenarios. 

Tentative Acquisition Schedule: 

dRFP Release: 8 Sep 26 

Final RFP Issuance: Jan 27

Proposals Due: Mar 27

Anticipated Award: 18 Dec 27 

Performance Start: 1 Apr 28 

4. Industry Day and Site Visit Event Details 

Interested businesses are invited to register for the upcoming two-day event. Representatives will have the opportunity to attend a briefing detailing the contract structure, tour key range facilities, and participate in one-on-one sessions with the Government program team. 

  • Dates: September 22, 2026 (General Briefing & Tour) – September 23, 2026 (One-on-One Sessions) 

  • Location: Vandenberg Space Force Base (VSFB), CA 

  • Maximum Attendees: Limited to two (2) representatives per prospective company due to base logistical constraints. 

Registration and RSVP Deadlines: 

  1. Attendee RSVP & Security Vetting Submission: No later than Friday, September 11, 2026, at 16:30 Pacific Time. Provide your full name and company. Late requests may not be processed. 

  2. One-on-One Meeting Request: Companies interested in booking a one-on-one session with the program office must explicitly request it via email by Tuesday, September 15, 2026, at 16:30 Pacific Time. Slots are limited and will be scheduled on a first-come, first-served basis. 

Maps and a tentative agenda are attached to this announcement to assist registered attendees with navigation and scheduling. 

Base Access & Entry Requirements: 

All site visit attendees must report to the Vandenberg Visitor Control Center (VCC), located at 6 California Blvd (Santa Maria Gate) prior to entry (VCC hours: 0600-1800). 

  • Arrive Early: Attendees are strongly encouraged to arrive early to the Visitor Control Center to allow sufficient time for base entry processing and to avoid delays getting to the briefing. 

  • Identification for Non-CAC Holders: Attendees who do not possess a Common Access Card (CAC) must present a REAL ID-compliant credential or a valid U.S. Passport. If an attendee does not have a REAL ID or a Passport, they must bring and present a standard state-issued Driver's License or ID card, a Birth Certificate, and a physical Social Security Card to obtain a base visitor pass. 

  • Foreign Nationals will not be able to participate due to the time necessary to vet access. 

5. Important Site Visit Disclaimers & Rules of Conduct: 

  • Change of Solicitation Terms: Please understand that nothing said during the Industry Day briefings, site tours, or one-on-one sessions by any Government representative changes the terms, conditions, specifications, or requirements of the solicitation. If a change to the solicitation is determined to be necessary based on what is discussed or observed, it will be formally issued as a written amendment via email. 

  • Photography and Video Restrictions: No photography or video recording is permitted on this installation at any time, unless specific, designated areas are explicitly pointed out and authorized by the hosting Facility Manager. 

6. Submission of Questions & Comments (CRM) 

The Government is actively seeking industry feedback on the Draft PWS and planned acquisition strategy to ensure clear, high-performing requirements. 

To submit questions or comments concerning the acquisition and dRFP, prospective offerors must use the official Comment Resolution Matrix (CRM) Excel spreadsheet (which will be posted with the Draft RFP documents). 

  • Completed CRM spreadsheets must be returned to the Points of Contact listed below. 

  • The deadline for submitting dRFP and Industry Day comments is September 29, 2026, by 16:30 Pacific Time. 

7. Primary Points of Contact 

For all RSVP submissions, one-on-one requests, CRM question submittals or administrative questions, please send correspondence via email to BOTH of the following representatives: 

  • Primary POC (Contracting Officer): 
    • Katherine Williams, 30 CONS/PKD 

    • Email: katherine.williams.9@spaceforce.mil 

  • Secondary POC (Contract Specialist): 

    • Sabrina Swain, 30 CONS/PKD 

    • Email: sabrina.swain.1@spaceforce.mil

*Amendments: 

9/8/2026: This office is updating this draft RFP to update and add additional attachments. 

9/29/2026: This office is updating the tentative acquisition schedule and extending the date of this draft RFP. 

10/8/2026: This office is adding the following attachments to this draft RFP: FRAME Industry Day Brief, FRAME Industry Day CRM 20261008, and FRAME RFP_GFP List_07Oct2026. 

10/26/2026: This office is adding the following attachement to this draft RFP: Frame Industry Day Attendees POCs 20261026.

UPDATE - 11/3/2026: This office is updating this draft RFP to add a second draft RFP package. 

The Government has posted an updated (second) version of the draft Request for Proposal (dRFP) package for the Facility Readiness and Maintenance Execution (FRAME) contract. 

Interested parties are requested to review the complete updated package and submit any questions or comments using the official Comment Resolution Matrix (CRM) spreadsheet. All files associated with this release include "v2" in the filename. Files provided as part of the Technical Library include "TL" in the filename. 

CRM / Comment Deadline: 22 November 2026 by 16:30 Pacific Time.

Completed CRM spreadsheets must be emailed to both of the following Points of Contact:

  • Contracting Officer: Katherine Williams, katherine.williams.9@spaceforce.mil 
  • Contract Specialist: Sabrina Swain, sabrina.swain.1@spaceforce.mil

Note: The revised CLIN structure is reflected in the Cost/price Workbook under the Section B tab. Offerors should carefully review this tab when preparing any feedback or future pricing models.

Updated Tentative Acquistion Schedule:

  • Second dRFP Posted: 3 November 2026
  • CRM Comments Due: 22 November 2026
  • Final RFP Issuance: 20 January 2027
  • Proposals Due: 21 March 2027

This remains a draft for planning purposes only. Nothing in this notice or the draft documents constitutes a formal solicitation or commitment by the Government. 

Documents

121 files

Sign up free to download these 121 files.

  • Attch 10 CRM Template - draft.xlsx
    23 KB · Sep 8, 2026
    Download
  • Attch 1 FRAME PWS - draft.docx
    267 KB · Sep 8, 2026
    Download
  • Attch 2 Apdx H Environmental Reqs - draft.docx
    137 KB · Sep 8, 2026
    Download
  • Attch 2 Apdx I PE Inventory - draft.xlsx
    1.0 MB · Sep 8, 2026
    Download
  • Attch 2 Apdx J Antenna Tower Resp List draft.docx
    45 KB · Sep 8, 2026
    Download
  • Attch 2 Appendix K L M N - draft.xlsx
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A001 Phase-In Plan Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A002 Phase-Out Plan Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A003 Data Management Plan Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A004 Program Mgmt Plan draft.pdf
    55 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A005 Program Mgmt Review Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A008 GFP GFM Inv Rpt Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A011 Sys Safety Pgm Plan Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A013 Accident Incdt Rpt Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A014 PE Resp List - Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A015 Work Order Status Rpt Draft.pdf
    32 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A016 Daily MR Schedule Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A017 Quality Mgmt Plan Draft.pdf
    54 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A018 Solid Waste Report - Draft.pdf
    55 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A019 HMMP Report - Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A020 Asbestos Lead Abatemt Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A021 Cathodic Prot Booklet Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A022 Backflow Prev Sys Rpt Draft.pdf
    53 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A023 Emission Equip Usage Draft.pdf
    33 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A024 Facility Asses Rpt Draft.pdf
    3.7 MB · Sep 8, 2026
    Download
  • Attch 3 CDRL A025 RCM Plan - Draft.pdf
    54 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A026 Corr Prev Ctl Plan draft.pdf
    55 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A027 Test Insp Rpt Draft.pdf
    56 KB · Sep 8, 2026
    Download
  • Attch 3 CDRL A028 Weekly MR Schedule Draft.pdf
    54 KB · Sep 8, 2026
    Download
  • Attch 3 Consolidated DID Files draft.pdf
    1.7 MB · Sep 8, 2026
    Download
  • Attch 4 FRAME Incentive Plan - Draft.docx
    94 KB · Sep 8, 2026
    Download
  • Attch 5 Appendix B Wage Rate Tables redacted.pdf
    125 KB · Sep 8, 2026
    Download
  • Attch 5 CBA IBEW 2024 12949 Appdx A redacted.pdf
    306 KB · Sep 8, 2026
    Download
  • Attch 6 DB WD CA20260014 %28Mod 5%29.pdf
    81 KB · Sep 8, 2026
    Download
  • Attch 6 DB WD CA20260018 %28Mod 6%29.pdf
    232 KB · Sep 8, 2026
    Download
  • Attch 7 SCA WD 1986-0431 %28Rev 68%29.pdf
    26 KB · Sep 8, 2026
    Download
  • Attch 7 SCA WD 2015-5637 %28Rev 34%29.pdf
    44 KB · Sep 8, 2026
    Download
  • Attch 7 SCA WD 2015-5647 %28Rev 29%29.pdf
    251 KB · Sep 8, 2026
    Download
  • Attch 8 Section L - draft.docx
    177 KB · Sep 8, 2026
    Download
  • Attch 9 Section M - draft.docx
    77 KB · Sep 8, 2026
    Download
  • RFI Atch 1 Industry Day Agenda_22-23 September 2026.pdf
    95 KB · Sep 8, 2026
    Download
  • RFI Atch 3 Map to Bldg 8500.png
    2.4 MB · Sep 8, 2026
    Download
  • RFI Atch 4 Bldg 8500 Map.pptx
    76 KB · Sep 8, 2026
    Download
  • FRAME Industry Day Brief.pptx
    4.7 MB · Oct 8, 2026
    Download
  • FRAME Industry Day CRM 20261008.xlsx
    63 KB · Oct 8, 2026
    Download
  • FRAME RFP_GFP List_07Oct2026.xlsx
    10.1 MB · Oct 8, 2026
    Download
  • FRAME Industry Day Attendees POCs 20261026.pdf
    58 KB · Oct 26, 2026
    Download
  • Attch 10 CRM Template - draftv2.xlsx
    23 KB · Nov 3, 2026
    Download
  • Attch 11 GFP TRACKER - 2026 - draftv2.xlsx
    149 KB · Nov 3, 2026
    Download
  • Attch 12 Workload Factors - draftv2.xlsx
    21 KB · Nov 3, 2026
    Download
  • Attch 13 FRAME DD254_RFP - draftv2.pdf
    75 KB · Nov 3, 2026
    Download
  • Attch 1 FRAME PWS - Draftv2.docx
    269 KB · Nov 3, 2026
    Download
  • Attch 2 Apdx H Environmental Reqs- draftv2.pdf
    452 KB · Nov 3, 2026
    Download
  • Attch 2 Apdx I PE Inventory - draftv2.xlsx
    1018 KB · Nov 3, 2026
    Download
  • Attch 2 Apdx J Antenna Twr Resp List draftv2.docx
    54 KB · Nov 3, 2026
    Download
  • Attch 2 Apdx K L M N FRAME- draftv2.xlsx
    53 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A001 Phase-In Plan Draftv2.pdf
    54 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A002 Phase-Out Plan Draftv2.pdf
    54 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A003 Data Mgmt Plan Draftv2.pdf
    54 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A004 Program Mgmt Plan Draftv2.pdf
    55 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A005 Program Mgmt Rev Draftv2.pdf
    53 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A006 Intg Cst Lbr Reimb Draftv2.pdf
    55 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A008 GFP GFM Invtry Rpt Draftv2.pdf
    53 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A011 Sys Safety Pgm Plan Draftv2.pdf
    53 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A012 Security Mgmt Plan Draftv2.pdf
    54 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A013 Accident Incdt Rpt Draftv2.pdf
    53 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A014 PE Resp List Draftv2.pdf
    53 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A015 Wrk Odr Status Rpt Draftv2.pdf
    33 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A016 Daily MR Schdle Draftv2.pdf
    54 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A017 Quality Mgmt Plan Draftv2.pdf
    54 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A018 Solid Waste Rpt Draftv2.pdf
    246 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A019 HMMP Rpt Draftv2.pdf
    53 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A020 Asbestos Lead Abate Draftv2.pdf
    53 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A021 Cathodic Prot Bklet Draftv2.pdf
    53 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A022 Backflow Prev Rpt Draftv2.pdf
    53 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A023 Emission Equp Usage Draftv2.pdf
    33 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A024 Facility Asses Rpt Draftv2.pdf
    3.7 MB · Nov 3, 2026
    Download
  • Attch 3 CDRL A025 RCM Plan Draftv2.pdf
    55 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A026 Corr Prev Ctl Plan Draftv2.pdf
    55 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A027 Test Insp Rpt Draftv2.pdf
    56 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A028 Weekly MR Schdle Draftv2.pdf
    53 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A029 Sustainment Roadmap Draftv2.pdf
    54 KB · Nov 3, 2026
    Download
  • Attch 3 CDRL A030 Maintenance Data Draftv2.pdf
    54 KB · Nov 3, 2026
    Download
  • Attch 3 Consolidated DID Files draftv2.pdf
    1.7 MB · Nov 3, 2026
    Download
  • Attch 4 FRAME Incentive Plan - draftv2.docx
    89 KB · Nov 3, 2026
    Download
  • Attch 5 Appdx B Wage Rate Tables redactedv2.pdf
    125 KB · Nov 3, 2026
    Download
  • Attch 5 CBA IBEW 2024 12949 redactedv2.pdf
    306 KB · Nov 3, 2026
    Download
  • Attch 6 DB WD CA20260014 %28Mod 5%29v2.pdf
    81 KB · Nov 3, 2026
    Download
  • Attch 6 DB WD CA20260018 %28Mod 6%29v2.pdf
    232 KB · Nov 3, 2026
    Download
  • Attch 7 SCA WD 1986-0431 %28Rev 68%29v2.pdf
    26 KB · Nov 3, 2026
    Download
  • Attch 7 SCA WD 2015-5637 %28Rev 34%29v2.pdf
    44 KB · Nov 3, 2026
    Download
  • Attch 7 SCA WD 2015-5647 %28Rev 29%29v2.pdf
    251 KB · Nov 3, 2026
    Download
  • Attch 8 Cost Price Workbook-draftv2.xlsx
    336 KB · Nov 3, 2026
    Download
  • Attch 8 L-1 BOE Workbook-draftv2.xlsx
    84 KB · Nov 3, 2026
    Download
  • Attch 8 Section L - draftv2.docx
    181 KB · Nov 3, 2026
    Download
  • Attch 9 Section M - draftv2.docx
    76 KB · Nov 3, 2026
    Download
  • TL 20250624 VSFB CCCPM for Submittal to DDWv2.pdf
    4.4 MB · Nov 3, 2026
    Download
  • TL CDRL A006 Consol Cost Lbr Fund Samplev2.xlsx
    109 KB · Nov 3, 2026
    Download
  • TL CDRL A014 PE Responsibility List Samplev2.xlsx
    1.1 MB · Nov 3, 2026
    Download
  • TL CDRL A015 Work Order Status Rpt Samplev2.xlsx
    20 KB · Nov 3, 2026
    Download
  • TL CDRL A016 Daily Main Rpr Schdle Samplev2.pdf
    37 KB · Nov 3, 2026
    Download
  • TL CDRL A018 Solid Waste Report Samplev2.pdf
    92 KB · Nov 3, 2026
    Download
  • TL CDRL A021 Cathodic Prot Bklet Samplev2.pdf
    58 KB · Nov 3, 2026
    Download
  • TL CDRL A022 Backflow Prev Sys Rpt Samplev2.pdf
    688 KB · Nov 3, 2026
    Download
  • TL CDRL A023 Emission Equip Usage Samplev2.xlsx
    81 KB · Nov 3, 2026
    Download
  • TL CDRL A026 Corr Prev Ctrl Rpt Samplev2.pdf
    720 KB · Nov 3, 2026
    Download
  • TL CDRL A027 Testing and Cert Samplev2.pdf
    664 KB · Nov 3, 2026
    Download
  • TL CDRL A028 Weekly Main Rpr Schdle Samplev2.xlsx
    17 KB · Nov 3, 2026
    Download
  • TL CES Launch Operations Support Templatev2.pdf
    183 KB · Nov 3, 2026
    Download
  • TL Framelight Policy Change 8 Jan 2024v2.pdf
    102 KB · Nov 3, 2026
    Download
  • TL - FY26 12 Month TR list for Tech Libraryv2.xlsx
    22 KB · Nov 3, 2026
    Download
  • TL HPGSA-PV-229-VTE-01242024v2.pdf
    719 KB · Nov 3, 2026
    Download
  • TL HPGSA-PV-230-VTE-01242024v2.pdf
    696 KB · Nov 3, 2026
    Download
  • TL ISWMP Final Sept 2026v2.pdf
    4.4 MB · Nov 3, 2026
    Download
  • TL Launch Slips Liftoffs by OYs total hrsv2.xlsx
    20 KB · Nov 3, 2026
    Download
  • TL Pillar Point Launches or Sys Tests draftv2.pdf
    72 KB · Nov 3, 2026
    Download
  • TL Pillar Point Outfall Drain Insp examplev2.pdf
    104 KB · Nov 3, 2026
    Download
  • TL PM Workload Matrix CLINv2.xlsx
    33 KB · Nov 3, 2026
    Download
  • TL PTO 13968R4 and Part 70 Dec 2025v2.pdf
    2.3 MB · Nov 3, 2026
    Download
  • TL Service call historical datav2.xlsx
    299 KB · Nov 3, 2026
    Download
  • TL SLD 30 FACILITY MNGR PRGM INSTR 32-1001v2.pdf
    1.2 MB · Nov 3, 2026
    Download

Similar open bids

Same NAICS 561210

More from Department of the Air Force

Open bids, other NAICS codes