ProposalWorkspaceFederal OpportunitiesDepartment of Energy

Design-Build Services – STM Security Fencing - North Boundary

Active RFP-2027-27107 SolicitationTotal Small Business Set-Aside (FAR 19.5)Department of Energy
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Alliance for Energy Innovation, Llc - DOE Contractor of Department of Energy posted this Solicitation on Oct 30, 2026. Responses are due Nov 12, 2026. NAICS 238990 (All Other Specialty Trade Contractors), product or service code 5660 (Fencing, Fences, Gates and Components). Set-aside: Total Small Business Set-Aside (FAR 19.5). Place of performance: Colorado 80401. Solicitation number RFP-2027-27107.

Solicitation details

General information

Solicitation number
RFP-2027-27107
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Place of performance
Colorado 80401

Classification

NAICS
238990All Other Specialty Trade Contractors
Product or service
5660Fencing, Fences, Gates and Components

Agency

Department
Department of Energy
Sub-tier
Department of Energy
Office
Alliance for Energy Innovation, Llc - DOE Contractor

Description

From SAM.gov

This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement.

Project Overview

The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations.

Design‑Build Requirements

The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals.

Construction Requirements

All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits.

Management, Coordination, and Quality Assurance

The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.

Documents

4 files

Sign up free to download these 4 files.

  • SAM Post Narrative - STM North Boundary Fencing.pdf
    158 KB · Oct 7, 2026
    Download
  • 0 - RFP-2027-27107 - STM Security Fencing- North Boundary - LPTA.pdf
    304 KB · Oct 8, 2026
    Download
  • AMENDMENT NO. 1 - RFP-2027-27107.pdf
    187 KB · Oct 22, 2026
    Download
  • RFP - Amendment 2 - Drone Video Extension.pdf
    191 KB · Oct 30, 2026
    Download

Similar open bids

Same NAICS 238990

More from Department of Energy

Open bids, other NAICS codes