ProposalWorkspaceFederal OpportunitiesDepartment of Energy

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Active RFP-376508-CD SolicitationDepartment of Energy
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Fermilab - DOE Contractor of Department of Energy posted this Solicitation on Oct 30, 2026. Responses are due Dec 17, 2026. NAICS 236210 (Industrial Building Construction), product or service code Z2EZ (Repair or Alteration of Other Industrial Buildings). Place of performance: Illinois 60510. Solicitation number RFP-376508-CD.

Solicitation details

General information

Solicitation number
RFP-376508-CD
Notice type
Solicitation
Place of performance
Illinois 60510

Classification

NAICS
236210Industrial Building Construction
Product or service
Z2EZRepair or Alteration of Other Industrial Buildings

Agency

Department
Department of Energy
Sub-tier
Department of Energy
Office
Fermilab - DOE Contractor

Description

From SAM.gov

On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026.

On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment  No. 1.

On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.

This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.

The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.

The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.  The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.

This project includes the following milestones:

Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.

Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin.

Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete.

Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete.

Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

Documents

26 files

Sign up free to download these 26 files.

  • 1.0 RFP 376508-CD Instructions to Offerors.pdf
    310 KB · Sep 17, 2026
    Download
  • Exhibit A - Scope of Work UIP SP-1 CUB.pdf
    252 KB · Sep 17, 2026
    Download
  • Exhibit B- Construction Drawing Set.pdf
    105.5 MB · Sep 17, 2026
    Download
  • Exhibit C- Specification Set- New CHW Plant and CUB Upgrades.pdf
    28.7 MB · Sep 17, 2026
    Download
  • Exhibit D- Geotechnical Engineering Report.pdf
    36.9 MB · Sep 17, 2026
    Download
  • Exhibit E- Electrical %28LV%29 Calculations.pdf
    347 KB · Sep 17, 2026
    Download
  • Exhibit F- Army Corp NPR-Letter.pdf
    158 KB · Sep 17, 2026
    Download
  • Exhibit G- FFDG General Terms and Conditions for Construction %2808.2025%29.pdf
    320 KB · Sep 17, 2026
    Download
  • Exhibit H - Construction Insurance Requirements.pdf
    245 KB · Sep 17, 2026
    Download
  • Exhibit I - Statement of Acknowledgment %28SF-1413%29.pdf
    699 KB · Sep 17, 2026
    Download
  • Exhibit J - Fermilab Subcontractor Safety Information Questionnaire.pdf
    1.4 MB · Sep 17, 2026
    Download
  • Exhibit K- Price Proposal Form.pdf
    734 KB · Sep 17, 2026
    Download
  • Exhibit L- Subcontractor Annual RepsCerts-SARC. Rev 8.pdf
    476 KB · Sep 17, 2026
    Download
  • Exhibit M- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf
    476 KB · Sep 17, 2026
    Download
  • Exhibit N- Bond Bid FL-41.pdf
    749 KB · Sep 17, 2026
    Download
  • Exhibit O- FL-42 %28Rev 1.25%29 - Payment Bond.pdf
    1.6 MB · Sep 17, 2026
    Download
  • Exhibit P- Performance Bond_FL-40.pdf
    743 KB · Sep 17, 2026
    Download
  • Exhibit Q- Davis Bacon Wage Rate.pdf
    482 KB · Sep 17, 2026
    Download
  • Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf
    747 KB · Sep 17, 2026
    Download
  • Amend 01 to RFP 376508-CD.pdf
    159 KB · Oct 6, 2026
    Download
  • Amend 02 to RFP 376508-CD.pdf
    124 KB · Oct 7, 2026
    Download
  • Amend 03 CUB Electrical Upgrade As-Builts.pdf
    16.9 MB · Oct 30, 2026
    Download
  • Amend 03 CUB Original As-Built Drawings.pdf
    20.0 MB · Oct 30, 2026
    Download
  • Amend 03 Submittal for DHP-CU-1.pdf
    630 KB · Oct 30, 2026
    Download
  • Amend 03 to RFP 376508-CD.pdf
    180 KB · Oct 30, 2026
    Download
  • Amend 03 Transformer Pics.zip
    2.6 MB · Oct 30, 2026
    Download

Similar open bids

Same NAICS 236210

More from Department of Energy

Open bids, other NAICS codes