2026 Citywide Sidewalk Repair Project

Active PlanetBidsHartford-e500d451 IFBConstruction - Heavy & CivilPW Dept: Engr & Transportation Div.
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

PW Dept: Engr & Transportation Div. (Arizona) posted this IFB on Oct 23, 2026. Responses are due Nov 23, 2026. Category: Construction - Heavy & Civil. Solicitation number PlanetBidsHartford-e500d451.

Solicitation details

General information

Solicitation number
PlanetBidsHartford-e500d451
Notice type
IFB
Place of performance
Arizona

Agency and category

Agency
PW Dept: Engr & Transportation Div.
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

In general, work shall include but not limited to demolition of sidewalk, curb and gutter, driveway approaches, cross gutters, removal and disposal of existing trees and existing tree stumps; furnishing and installing new 15-gallon trees, plant establishment and maintenance period; repairing of sidewalk, curb and gutter, driveway approaches, cross gutters, grinding of sidewalk lips, construction of ADA pedestrian curb ramps; excavation, hauling and disposal of pavement, soil, and concrete; traffic control as noted on the plans and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions.

Scope

In general, work shall include but not limited to demolition of sidewalk, curb and gutter, driveway approaches, cross gutters, removal and disposal of existing trees and existing tree stumps; furnishing and installing new 15-gallon trees, plant establishment and maintenance period; repairing of sidewalk, curb and gutter, driveway approaches, cross gutters, grinding of sidewalk lips, construction of ADA pedestrian curb ramps; excavation, hauling and disposal of pavement, soil, and concrete; traffic control as noted on the plans and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions.

Similar open bids

In Arizona