Engineering (California) posted this IFB on Oct 20, 2026. Responses are due Nov 20, 2026. Category: Construction - Heavy & Civil. Solicitation number BID 12-04.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The base bid Work includes widening the existing East Palm Canyon Drive Bridge (including architectural treatment and lighting), CV Sync conduit installation, constructing new curb, gutter, and sidewalk, constructing a driveway and curb ramps, constructing a bus pad, constructing retaining walls, a new soundwall at the mobile home park, utility coordination including SCE capacitor bank relocation, storm drain improvements, improvements to the Araby parking lot, rehabilitating the pedestrian bridge deck and railings adjacent to the bridge, striping, and pavement rehabilitation.
The base bid Work includes widening the existing East Palm Canyon Drive Bridge (including architectural treatment and lighting), CV Sync conduit installation, constructing new curb, gutter, and sidewalk, constructing a driveway and curb ramps, constructing a bus pad, constructing retaining walls, a new soundwall at the mobile home park, utility coordination including SCE capacitor bank relocation, storm drain improvements, improvements to the Araby parking lot, rehabilitating the pedestrian bridge deck and railings adjacent to the bridge, striping, and pavement rehabilitation.
The add alternate Work includes additional cold plane and overlay limits, water valve adjustments, survey monument reestablishment, and striping and pavement markings to match the existing layout. These items are listed in Bid Schedule B, which may or may not be awarded.