Sutter County (California) posted this IFB on Oct 28, 2026. Responses are due Nov 10, 2026. Category: Construction - Heavy & Civil. Solicitation number ST31002440N.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary for the FY2023-24 Culvert Replacements – Lincoln Rd at Snake River. The project consists of dewatering the canal, cleaning and removing sediment from both existing culverts, sealing interior concrete joints, and applying a high-strength spray-applied lining system.
The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary for the FY2023-24 Culvert Replacements – Lincoln Rd at Snake River. The project consists of dewatering the canal, cleaning and removing sediment from both existing culverts, sealing interior concrete joints, and applying a high-strength spray-applied lining system.
Work also includes temporary traffic control and road closure, proper waste disposal, and final inspection. As an additive alternative, existing fence posts and the wood board headwall may be replaced in kind or with an approved equivalent structure.
**Bidder's security:** Submit one of the following forms of bidder's security equal to at least 10 percent of the bid, with your bid, made payable to the County of Sutter:
The award is made to the lowest responsible bidder within 60 days. The successful bidder must furnish 2 bonds: a payment bond and a performance bond, each equal to at least 100 percent of the total bid.
The successful bidder must sign the Contract form. The Department must receive the signed Contract form, Contract Bonds and insurance documents before the 10th business day after the bidder receives the contract.
Submit the Subcontractor List with your bid. Complete the forms in the Bid Book. Failure to submit the forms and information as specified may result in a nonresponsive bid.
Work shall be scheduled on a working day between the hours of 7:00 am and 5:00 pm.
Sign up free to get these 6 documents.