2026-GS-14 Switchgear Preventative Maintenance and Overload Testing

Active PE-63125-NONST-2027-000000083 RFPUtilities & EnergyClayton County Water Authority
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Clayton County Water Authority (Georgia) posted this RFP on Oct 15, 2026. Responses are due Nov 12, 2026. Category: Utilities & Energy. Solicitation number PE-63125-NONST-2027-000000083.

Solicitation details

General information

Solicitation number
PE-63125-NONST-2027-000000083
Notice type
RFP
Place of performance
Georgia

Agency and category

Agency
Clayton County Water Authority
Category
018Utilities & Energy
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Clayton County Water Authority (CCWA) owns and operates various facilities to supply, produce, treat, and distribute water to its customers throughout Clayton County, Georgia. These facilities include raw water diversion, groundwater recharge, water wells, water treatment and production plants, water storage facilities, lift stations, and pressure-regulating stations. CCWA facilities operate on a 24/7 basis and depend upon safe and reliable electrical equipment and infrastructure.

Additional information

All submissions must be submitted electronically via the Procurement Portal https://ccwa.bonfirehub.com under the respective Project.

Your submission must be uploaded, submitted, and finalized prior to the Project's posted due date. CCWA strongly recommends allowing sufficient time to complete this process (ideally a week prior to the deadline) to begin the uploading process and to finalize your submission. Uploading large documents may take time, depending on the size of the file(s) and your Internet connection speed.

Documents

1 file

Sign up free to get this document.

  • CCWA Bonfire Portal Instructions.pdf
    Download

Similar open bids

In Georgia

More from Clayton County Water Authority

Open bids