Dalton Utilities (Georgia) posted this IFB on Oct 28, 2026. Responses are due Nov 11, 2026. Category: Utilities & Energy. Solicitation number PE-75553-NONST-2027-000000065.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Dalton Utilities requests firm bids from qualified manufacturers and suppliers for the engineering, manufacture, testing, documentation, delivery, and specified field services for seven (7) indoor 480V motor control centers at the J.D. Cope Energy Facility. The attached Technical Specification 5.5330, Rev. B, including the equipment datasheets, governs the technical scope.
The Work of this Purchase Order includes but is not limited to the following:
Spare parts, special tools, hardware, lubricants, and other consumables required for complete installation and commissioning shall be provided by Supplier. These shall be delivered to Site with the Goods being provided under this Purchase Order.
Supplier shall provide a list of manufacturer's recommended spare parts for: 1) first two (2) years of operation; 2) installation and commissioning; 3) capital spares (spares not subject to wear).
All bids should be submitted electronically to dkeaton@dutil.com
Owner/Point of Delivery: 101 Looper Bridge Rd. SE Chatsworth, GA 30705.
Unit Prices for spare parts shall be valid for purchase by Owner for two (2) years after Substantial Completion.
The anticipated life that is required for Equipment and Materials furnished is 30 years.