Gordon State College (Georgia) posted this RFQ on Nov 4, 2026. Responses are due Dec 3, 2026. Category: Construction - Building. Questions are due 2026-11-19. Solicitation number PE-57600-RFQ-2027-000000016.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Gordon State College is seeking bids from qualified contractors for the Chiller replacement at Lambdin Hall on GSC campus. The Owner will receive sealed bids from Contractors for the construction of Lambdin Hall Chiller Replacement, located in Gordon State College, Barnesville, Georgia.
The Owner will receive sealed bids from Contractors. Bids must be physically on the table in the Bid Room in Facility Building by 2:00 P.M., at the time legally prevailing in Atlanta, Georgia on **Thursday, December 3, 2026**, for the construction of Lambdin Hall Chiller Replacement, located in Gordon State College, Barnesville, Georgia. At the time and place noted above, the bids will be publicly opened and announced.
**Sealed bids** must be physically on the table in the Bid Room in Facility Building. See the attached map for location details.
Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of thirty-five days after time has been called on the date of opening except in accordance with the provisions of Georgia law. Bids must be accompanied by a Bid Bond made payable to the Owner in an amount equal to not less than **five percent of the Bid**. Both a performance bond and a payment bond will be required, each in an amount equal to **100 percent of the Contract Sum** prior to execution of contract.
The Owner anticipates that the contract will be awarded to the responsive and responsible bidder who provides the lowest bid within the budget. In judging whether the bidder is responsible, the Owner will consider, but is not limited to, the following:
Responses to questions, and any resulting addenda will be posted by Tuesday, November 24, 2026, close of business.
Sign up free to get these 2 documents.