Gary Sanitary District (Indiana) posted this RFQ on Oct 29, 2026. Responses are due Nov 19, 2026. Category: Construction - Heavy & Civil. Solicitation number OpenGov-eba8e3ea.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Sanitary Sewer Repair at 1608 Broadway in the City of Gary, IN.
Furnish all labor, materials, tools, equipment, superintendence, and all necessary incidentals for the repair of sanitary sewer pipe.
Furnish all labor, materials, tools, equipment, superintendence, and all necessary incidentals for the repair of sanitary sewer pipe.
Manhole No. 507 Sewer Invert Depth is ± 13.7
Manhole No. 508 Sewer Invert Depth is ± 13.9
POINT REPAIR
Remove and replace existing 15-inch diameter pipe with 15-inch diameter PVC SDR 35 ± 30-linear feet from Manhole No. 508 going towards Manhole No. 507.
CIPP LINING
CIPP line existing 15-inch diameter pipe x 190 linear feet starting from Manhole No. 508 to Manhole No. 507.