City of Ames (Iowa) posted this RFP on Nov 5, 2026. Responses are due Dec 10, 2026. Category: Architecture & Engineering. Questions are due 2026-11-18 17:00. Solicitation number 2027-053.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Ames Electric Services Department (City) Is interested in acquiring the services of a consulting firm (Firm) to provide engineering services for the replacement of three load centers located in the City of Ames Power Plant. The design shall include a plan for removal of current equipment, new load center housing for selected breakers with a motorized racking mechanism, breaker control circuits including remote and manual local control, and implementation of the design into current plant electrical systems. Plans and specifications provided will be used to bid the purchase and installation of the equipment. To comply with public bidding laws, procurement documents must be stamped by a licensed professional engineer in the State of Iowa.
This project shall include the replacement of Load centers 5, 6, and 7. The new load centers will be sized to source the same loads from a 3 phase 480VAC bus. Breakers shall be equipped with an automatic racking mechanism. Spare cubicles and load capacity to support plant additions are desired.
The breakers installed on the new load center shall be controlled through Emerson’s Ovation distributed control system (DCS) and be monitored through OSI monarch supervisory control and data acquisition (SCADA). Note: The Power Plant is undergoing SCADA replacement. A selection of SEL products is desired to maintain DCS and SCADA functionality.
Scope of Services
The following tasks shall be completed for the load center replacement:
PROPOSALS will be accepted by the City of Ames until **2:00 PM local time on December 10, 2026**, in AmesBids at amesbids.ionwave.net. Firms must be a registered supplier to submit a proposal in AmesBids. Proposals shall be uploaded in the Response Attachment in AmesBids.
The proposal shall include acknowledgement of receipt of all addenda.
Fee Proposal
Evaluation
The evaluation and rating of the technical proposal will be completed before the fee proposal is opened or considered. Proposals will be evaluated based on:
1. The Firm’s demonstrated understanding of the project and ability to provide the required services, as evidenced by the quality, clarity, and completeness of its proposal
2. The Firm’s experience and past performance, including customer satisfaction and references.
3. The proposed timeline for the completion of the project.
4. Cost
Firm Selection: January 2027. Project Kickoff: February 2027.