Johnson County (Kansas) posted this RFQu on Nov 4, 2026. Responses are due Dec 9, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-25 14:00. Solicitation number 2026-045 Addendum 1.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This is a Progressive Design-Build services procurement. JCW is seeking a statement of qualifications (SOQ) from teams/Design-Builders to provide preconstruction and design with the option of construction services for the Brush Creek Pump Station (BCPS) Improvements (“Project”), Contract No. MTM1-C080. This Request for Qualifications (RFQ) is the first phase of a three-phase procurement process for selection of a Design-Builder.
JCW is seeking SOQs from qualified Design-Builders to initially provide pre-construction services and design services to complete the design based on HDR’s 2026 Preliminary Engineering Report. JCW and Owner’s Advisor will assist the Design-Builder to design and construct a new Brush Creek Pump Station.
The estimated total project cost, including engineering, easements, land acquisitions, and construction is between **$12-$17 million**, which includes escalation to midpoint of construction in 2029.
Phase 1 Pre-Construction and Preparation of Phase 2 Construction Price
The Design-Builder shall consult with the County and the Owner’s Advisor throughout the development of pre-design, final design, and a Phase 2 Construction Price. The general scope of services anticipated for the Pre-Construction Phase includes, but may not be limited to, the following:
Phase 2 Construction Phase
The general scope of services anticipated for the Construction Phase includes, but is not limited to, the following:
Submission
The SOQ submission must be submitted electronically at https://jocogov.ionwave.net by a respondent. You must register as a supplier at https://jocogov.ionwave.net at least two (2) business days prior to the RFQ opening to ensure a successful registration. No other method of submitting SOQ’s will be accepted.
Evaluation
The Progressive Design Build solicitation is a three-stage qualifications-based selection process. Members of the Evaluation Committee will independently review and score each submittal based on the criteria listed herein.
Bonding and Insurance
Ability to secure required performance and payment bonds with a qualified surety company up to **$20 Million** demonstrated through a letter from the Surety stating the bonding capacity of the firm and rating of Surety.
Contract Term
The Contract resulting from this solicitation process shall be effective once duly executed and will remain in full force and effect until the Project is completed and final payment has been made by the County to the Contractor.