Maryland State Highway Administration (Maryland) posted this IFB on Oct 20, 2026. Responses are due Nov 12, 2026. Category: Utilities & Energy. Solicitation number BPM059308.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This Invitation for Bids (IFB) is issued to procure the goods or services, as specified in this Section 2, from a contract between the successful bidder and the State of Maryland (“State”).
All LED lamps, retrofit kits, luminaires, and fixtures (except miniature LEDs and LED exit signs) must be:
All exterior LED luminaires shall be fully shielded to minimize light pollution. All LED drivers must have a minimum rated life of 50,000 hours and comply with the European Union’s Restriction of Hazardous Substances (RoHS) Directive.
All exit signs must be:
Fluorescent lamps, HID lamps, and ballasts are considered limited use lighting products and shall only be used when LED equipment is not a practical solution or LED replacements do not exist.
All lighting equipment recycled under this contract shall be managed by an authorized lamp, ballast or electronic waste recycling company. Pursuant to State Finance and Procurement Article §14–415 of the Annotated Code of Maryland, contractors shall use recyclers that are certified by either e-Stewards or R2.
The Contractor shall submit quarterly sales data to the State over the life of this contract. This information must include details about the recycled content, third-party sustainability certifications, and other environmental attributes of products and services provided under the contract.
Bidders/Offerors shall provide the following documents with their response:
Bidders/offerors who suggest products that are not certified but meet the energy efficiency requirement shall provide a list of such products with their bids/offers. That list must include each product’s energy efficiency information.
A bidder or offeror shall include the sustainable practices it employed during the contract period for each listed reference.
Bidders/Offerors must complete and submit the *Maryland Living Wage Requirements Affidavit of Agreement* (Attachment G) with their Bid/Proposal. If the Bidder/Offeror fails to complete and submit the required documentation, the State may determine the Bidder/Offeror to not be responsible under State law.
Sign up free to get these 22 documents.