Bergen County (New Jersey) posted this IFB on Nov 12, 2026. Responses are due Dec 4, 2026. Category: Facilities & Janitorial. Solicitation number BC-BID-26-35.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The County of Bergen is requesting bids for HVAC – Time & Material. The prices offered on these products will be made available to Co-op Members, consisting of local municipal governments, public schools, vocational schools, counties, and other quasi-public entities throughout the State of New Jersey.
The purpose of this bid is to provide emergency repair service, consulting and preventative maintenance service on all equipment, controllers, and associated devices related to the heating, ventilation, air conditioning, and building control systems (pneumatic, electric, direct digital control, automation, etc.).
The contractor(s) must provide the services stated in this RFB at any of the NJCPA Member's premises in the area(s) on which a bid was submitted and a contract is awarded.
Equipment to be serviced includes units ranging from small refrigeration and air conditioning units to peripheral accessories. This also includes all heating and cooling systems of all sizes.
Items to be installed and/or serviced will include hermetic compressors, expansion valves, starting relays, evaporator and condenser fan motors, refrigerant piping, capillary tubes, timers, window air conditioners, reach-in and walk-in boxes, split-type air conditioning systems, electric heaters, water valves and portable air conditioning units. [...] These are typical but not all-inclusive items.
The Contractor shall respond to emergency calls from the Member within two (2) hours during the normal workday and week, and within five (5) hours on weekends, holidays, and evening hours with staff sufficient to address the emergency described by the Member to the Contractor in the emergency call.
Guarantees and warranties of the work performed and materials used shall be provided for a period of one year.
**Bid Proposal Forms:** Vendors should complete the bid proposal forms to include all-inclusive labor rate, and material mark-up percentages.
Bidders must take into account the 1% NJCPA Administrative Fee in all bid amounts.
All bid forms and pricing sheets must be signed and dated. Failure to do so may render your bid non-responsive.
Bids for HVAC – Time & Material will be evaluated based on a vendor's responsiveness to the requirements set forth in these bid specifications. Awards may be made by County or on a regional basis pertaining to the respondent(s)' ability to serve specific areas within the State and will be based on rates submitted in response to this bid.
In some cases, a NJCPA Co-op Member may request a performance bond. Therefore, the NJCAP asks for a cost per $1,000 ($/$1K) for a performance bond.
The term of this contract will be for (1) years with extensions as permitted by law upon mutual agreement between the NJCPA and the Contractor(s).
The Contractor(s) will provide copies of all applicable certificates and licenses required in the State of New Jersey to repair and service HVAC systems and related materials. Additionally, vendors shall complete the *Vendor Qualification Form*.
Subscribe to get these 14 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.