Township of North Brunswick (New Jersey) posted this IFB on Oct 28, 2026. Responses are due Nov 17, 2026. Category: Construction - Heavy & Civil. Solicitation number BID26019.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The project generally consists of the removal and replacement of a 24-inch diameter reinforced concrete pipe (RCP) including the installation of a reinforced concrete headwall and gabion mattress scour hole.
The project generally consists of the removal and replacement of a 24-inch diameter reinforced concrete pipe (RCP) including the installation of a reinforced concrete headwall and gabion mattress scour hole.
The project also proposes to remove and replace the existing type B inlet Along Lee Avenue, which discharges to the subject outfall pipe, with concrete vertical knockout curb to stabilize the edge of pavement. Minor roadway and driveway restorations, landscaping, and other associated improvements are proposed as part of this project. Work on additional roadways may be ordered, if deemed necessary by the Township Mayor and Township Council.