County Route 3 over West Settlement Creek Bridge Replacement, Town of Halcott

Active 2140148 IFBConstruction - Heavy & CivilGreene County
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Greene County (New York) posted this IFB on Oct 22, 2026. Responses are due Nov 19, 2026. Category: Construction - Heavy & Civil. Solicitation number 2140148.

Solicitation details

General information

Solicitation number
2140148
Notice type
IFB
Place of performance
New York

Agency and category

Agency
Greene County
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Notice is hereby given that the Greene County Highway Department will accept sealed bids for: County Route 3 over West Settlement Creek Bridge Replacement, Town of Halcott

PIN 1762.66

Contract Number D041079

The Owner is the Greene County Highway Department, and the work site is/are located in the Town of Halcott. The projects limits extend from: Approximately 250 ft southwest from the intersection of CR3 and CR1.

Scope

The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: The scope of work for the subject project consists of the replacement of the existing bridge and stream reconstruction downstream of the bridge. During construction of the bridge, traffic will be maintained using temporary approaches and a temporary bridge structure to the south of the existing bridge. The temporary bridge will be a single lane structure that will allow for alternating one-way traffic that will be controlled by a temporary traffic signal on each approach.

Additional information

This is a Federal Aid Project and NYSDOT Standard Specifications, officially finalized and adopted on May 1, 2026, as posted on the New York State Department of Transportation’s website must be followed by the successful bidder.

The DBE Utilization Goal is: 0.0%

The MBE Utilization Goal is: 7%