Dutchess County Water and Wastewater Authority (New York) posted this RFQu on Oct 20, 2026. Responses are due Nov 25, 2026. Category: Architecture & Engineering. Questions are due 2026-11-06. Solicitation number 2140074.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Dutchess County Water and Wastewater Authority [DCWWA], is soliciting a Request for Qualification Statement and Price Proposal [RFQ] from qualified professional engineering firms for professional design services for the Quaker Hills - Hyde Park Water Distribution Interconnection that will provide construction documents for the construction of:
The installation of an at-grade finished water storage tank is anticipated during the project, but shall be procured separately from the water main, pump station and all other appurtenances.
The firm selected will produce construction documents; drawings and specifications that accurately depict the project described above and in reference documents.
The Dutchess County Water and Wastewater Authority [DCWWA/Owner] is procuring professional design services from qualified Consultants [Consultant] for the preparation of construction documents including investigation, modeling, design, regulatory approval, permits, bidding and design services during construction for the detailed scope described below.
The scope of design services as described in schedule "A" includes:
Deliverables
Drafts for review: 2 hard copies and 1 PDF. Final: 3 hard copies, 1 PDF, 1 CAD (including external references, where applicable), and return Water GEMS model with updated hydraulic model.
The Consultant will develop construction documents for the purpose of bidding, with the approval/permitting of:
The Consultant's fee proposal shall include all direct and indirect labor costs, material costs, overhead, and profits. It is expected that the construction documents will comply with Wicks Law requirements.
The Consultant will prepare bid documents for single or multiple prime contractors bidding to include:
The proposal shall be prepared in two separate parts, containing a minimum one hard copy and one electronic copy:
Proposals shall be received at the DCWWA's offices at 1 LaGrange Avenue, Poughkeepsie, NY 12603 **no later than 4:00 PM** on due date referenced in Table 1, Schedule D. Proposals received after this time and date may not be accepted and may be rejected as non-responsive. Proposals received with unsealed price proposals will automatically be disqualified from the review of the RFQ.
Basis of evaluation
| Area of Review | % |
| --- | --- |
| 1 - Firm's Experience and management team | 25 |
| 2 - Project Staffing and experience | 25 |
| 3 - Proposed project plan | 25 |
| 4 - Previous Performance | 15 |
| 5 – Location | 5 |
| 6 - Workload of Firm with DCWWA | 5 |
The successful proposer will be required to execute an agreement with DCWWA for professional services within thirty (30) days. Proposer is advised to review the insurance requirements outlined in Article 10 of the standard service contract.