Southwestern Community College (North Carolina) posted this IFB on Oct 21, 2026. Responses are due Nov 12, 2026. Category: Construction - Building. Solicitation number 125-2026-10-3.
Scope of Work Includes a turnkey project:
Timeline & Impact:
Permits & Warranty:
Vendor will handle and provide for:
System Redundancy & Reliability:
The new system should offer built-in redundancy. If one unit goes offline for maintenance or service, the remaining three will automatically continue to provide hot water without noticeable interruption. This significantly reduces the risk of total system failure compared to a single tanked unit.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The intent of this solicitation is to award an Agency Contract to reconfigure the Founders Hall hot water distribution system.
The project includes a complete replacement and upsizing of the hot water distribution piping, which will improve delivery times and help balance temperature and flow across the building’s various wings.
Scope of Work Includes a turnkey project:
Timeline & Impact:
Permits & Warranty:
Vendor will handle and provide for:
System Redundancy & Reliability:
The new system should offer built-in redundancy. If one unit goes offline for maintenance or service, the remaining three will automatically continue to provide hot water without noticeable interruption. This significantly reduces the risk of total system failure compared to a single tanked unit.
Tasks/Deliverables
The vendor shall provide the following as part of their scope:
**Sealed, mailed responses ONLY** will be accepted for this solicitation. Attempts to submit a bid via facsimile (FAX) machine, telephone, or email in response to this IFB shall NOT be accepted.
Submit a signed, original executed bid response, two (2) photocopies, zero (0) un-redacted copies on CD, DVD or flash drive and, if required, zero (0) redacted copies on CD, DVD or flash drive of your bid simultaneously. Submit your bid in a sealed package. Clearly mark each package with: (1) Vendor name; (2) the IFB number; and (3) the due date.
Late bids, regardless of cause, will not be opened or considered, and will be automatically disqualified from further consideration.
For a contract to be awarded to you, your company (you) must be a North Carolina registered Vendor in good standing. You must enter the Vendor number assigned through eVP (Electronic Vendor Portal).
All responsive bids will be reviewed, and an award or awards will be based on the responsive bid(s) offering the lowest price that meets the specifications provided herein, to include any required verifications set out here in such as but not limited to past performance, references, and financial documents.
Offer shall be valid for at least sixty (60) days from date of bid opening.
The Contract shall begin on the date of final Contract execution (the “Effective Date”) or November 12, 2026, whichever is later. The Vendor shall begin work under the Contract within 30 business days of the Effective Date.
It shall be **MANDATORY** that a representative from each Vendor be present for a pre-bid site visit.
Sign up free to get this document.