Cascade Wells 6A and 6B Chlorination System, CIPWT00C36

Active 2027-20 ITBUtilities & EnergyCity of Gresham
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Gresham (Oregon) posted this ITB on Nov 4, 2026. Responses are due Nov 24, 2026. Category: Utilities & Energy. Questions are due 2026-11-13. Solicitation number 2027-20.

Solicitation details

General information

Solicitation number
2027-20
Notice type
ITB
Place of performance
Oregon
Questions due
2026-11-13

Agency and category

Agency
City of Gresham
Category
018Utilities & Energy
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The general work to be completed under this contract consists of a well video inspection, disinfection, mechanical rehabilitation (if necessary), zonal impulse generation with simultaneous pumping (if necessary), and construction of a chlorination system for each of two municipal wells completed in the Sand and Gravel Aquifer (SGA). In addition to the work on the wells, a wellhead cover shall be installed over each wellhead and a foundation for the wellhead cover shall be constructed.

The Owner is the City of Gresham, 1333 NW Eastman Parkway, Gresham, OR, 97030.

Scope

The work described in these specifications includes a well video inspection, well disinfection, mechanical brushing (if necessary), zonal impulse generation with simultaneous pumping (if necessary), construction of a chlorination system for each of two municipal wells completed in the Sand & Gravel Aquifer (SGA), and installation of wellhead covers.

The Contractor shall supply all materials, labor, appurtenances, equipment and incidentals necessary, and shall perform all operations and testing required to finish the work as specified under this contract.

A Chlorination System similar to those described by these specifications was installed in Cascade 8 and subsequently removed from the well. The Contractor will inspect materials from the Cascade 8 Chlorination System and use usable materials to build the Cascade 6B chlorination system.

Prior to installation in Cascade 6B, the contractor is responsible for inspecting and testing the pump from Cascade 8 to ensure it is in good working order. If necessary, the Contractor shall provide the Owner with costs for pump repair and/or pump replacement

The work to be completed under this contract does not include the installation of a permanent pump system, controls, electrical, wellhouse and connection to the water system.

Additional information

The Bidder shall provide the information described in this section or their bid may be considered non-responsive. The Statement of the Bidder's Qualifications (*Attachment A*) **must be submitted** to the Owner at the same time bids are due.

The Bidder must demonstrate they are licensed and bonded in the State of Oregon.

The contract will be awarded based on total cost for all sections including Additive work items.

The Owner intends to provide a written Notice to Proceed within 7 calendar days after the contract has been executed and the performance bond and all required insurances have been filed with and approved by the Owner.

Substantial completion of the chlorination systems shall be 90 calendar days from Notice to Proceed. Final completion of the chlorination systems shall be 14 calendar days from Substantial Completion.

Liquidated damages in the amount of **$800 per working day** will be assessed for failure to physically complete the project within the final completion time specified.

Goods and services for this project are being funded with monies made available by the Water Infrastructure Finance and Innovation Act program of the EPA that has statutory requirements commonly known as "American Iron and Steel" (AIS).

Documents

16 files

Sign up free to get these 16 documents.

  • Affirmative Action Provisions.pdf
    Download
  • American Iron and Steel (AIS) Requirement.pdf
    Download
  • C6A + C6B Chlorination System 100% Specifications.pdf
    Download
  • Certifications.pdf
    Download
  • Davis-Bacon Wage.pdf
    Download
  • Disadvantage Business Enterprises (DBE) Provisions.pdf
    Download
  • Equal Employment Opportunity Provisions.pdf
    Download
  • Exhibits.Attachments.pdf
    Download
  • First-Tier Subcontractor Disclosure Form.pdf
    Download
  • Labor Laws and Standards.pdf
    Download
  • Offer.pdf
    Download
  • Oregon Prevailing Wage Rates 070526.pdf
    Download
  • Prohibition on Certain Telecommunication and Video.pdf
    Download
  • Sample Capital Improvement Project Agreement.pdf
    Download
  • Sample Contract Retention Preference Form.pdf
    Download
  • Statement of Bidders Qualifications.pdf
    Download

Similar open bids

In Oregon

More from City of Gresham

Open bids