Centerville-Oates 138kV Line Rebuild
The Centerville-Oates 138 kV transmission line rebuild project, with distribution underbuild, is in Garland, Texas.
Owner – Refers to Garland Power and Light.
The transmission line scope of work consists of the installation of two (2) new single circuit 2-pole deadend steel monopole structures, three (3) new double circuit deadend steel monopole structures, four (4) new double circuit tangent steel monopoles, twelve (12) new single circuit tangent steel monopole structures, fifteen (15) new single circuit deadend steel monopole structures, and three (3) new single circuit angle steel monopole structures, with thirty eight (38) new spans of bundled 959 ACSS/TW, thirty eight (38) new spans of OPGW, the removal of forty-seven (47) existing spans of 795 ACSR, forty-seven (47) existing spans of 3/8 EHS shield wire, and the removal/topping (above distribution) of forty-six (46) existing steel monopole structures. Existing double circuits to Miller and Lyons to be transferred to new deadend monopole structures.
The underbuilt distribution line scope of work consists of the installation of eleven (11) new double circuit deadend steel monopole structures, fourteen (14) new double circuit tangent steel monopole structures, sixteen (16) new double circuit deadend/riser monopole structures, and five (5) new double circuit steel tangent/riser structures.
The underground distribution line scope of work consists of the installation of two (2) circuits of one thousand (1,000) feet of 1,000 kcmil cable, outside Centerville Substation under S. Glenbrook Dr. and W. Centerville Rd, and twenty-one (21) 1,000 kcmil feeder dips along Duck Creek Dr., all utilizing 6” steel/PVC conduit w/ an additional spare.
[...]
**NO FAXED OR EMAILED BIDS!** All documents (forms) herein and attached are **required** to be completed and returned with response.
This is an evaluated bid. Please pay close attention to the *GP&L Construction Contractor Questionnaire* and *Pricing Grading Sheet* and provide an organized and complete bid.
A Bid Bond in the amount of **5%** is **required** with your bid response; failure to do so will deem your bid non-responsive. A Performance, Payment and Maintenance Bond (2 yr.) will be required upon notification of award.
Completion is defined as all wire work complete and circuits energized. Cleanup and other tasks not requiring a line clearance are to be completed no later than thirty (30) days following completion of wire work and energization.
RETAINAGE: As security for the faithful completion of the work by the CONTRACTOR, the OWNER shall retain ten percent (10%) of the total dollar amount of work done on all contracts less than $200,000.00; five percent (5%) of the total dollar amount of work done on all contracts of $200,000.00 or more.