Oates to Centerville Transmission Line Construction Services (GP&L)

Active REQ00003581 RFPConstruction - Heavy & CivilCity of Garland
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Garland (Texas) posted this RFP on Nov 18, 2026. Responses are due Dec 8, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-12-04 17:00. Solicitation number REQ00003581.

Solicitation details

General information

Solicitation number
REQ00003581
Notice type
RFP
Place of performance
Texas
Questions due
2026-12-04 17:00

Agency and category

Agency
City of Garland
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Centerville-Oates 138kV Line Rebuild

The Centerville-Oates 138 kV transmission line rebuild project, with distribution underbuild, is in Garland, Texas.

Owner – Refers to Garland Power and Light.

Scope

The transmission line scope of work consists of the installation of two (2) new single circuit 2-pole deadend steel monopole structures, three (3) new double circuit deadend steel monopole structures, four (4) new double circuit tangent steel monopoles, twelve (12) new single circuit tangent steel monopole structures, fifteen (15) new single circuit deadend steel monopole structures, and three (3) new single circuit angle steel monopole structures, with thirty eight (38) new spans of bundled 959 ACSS/TW, thirty eight (38) new spans of OPGW, the removal of forty-seven (47) existing spans of 795 ACSR, forty-seven (47) existing spans of 3/8 EHS shield wire, and the removal/topping (above distribution) of forty-six (46) existing steel monopole structures. Existing double circuits to Miller and Lyons to be transferred to new deadend monopole structures.

The underbuilt distribution line scope of work consists of the installation of eleven (11) new double circuit deadend steel monopole structures, fourteen (14) new double circuit tangent steel monopole structures, sixteen (16) new double circuit deadend/riser monopole structures, and five (5) new double circuit steel tangent/riser structures.

The underground distribution line scope of work consists of the installation of two (2) circuits of one thousand (1,000) feet of 1,000 kcmil cable, outside Centerville Substation under S. Glenbrook Dr. and W. Centerville Rd, and twenty-one (21) 1,000 kcmil feeder dips along Duck Creek Dr., all utilizing 6” steel/PVC conduit w/ an additional spare.

[...]

  • Underground distribution circuits to be megger tested at custody handoff and after install.
  • Install dampers on the shields and conductors as shown on the plan and profile.
  • Install and remove construction access and environmental controls, as needed.

Additional information

**NO FAXED OR EMAILED BIDS!** All documents (forms) herein and attached are **required** to be completed and returned with response.

This is an evaluated bid. Please pay close attention to the *GP&L Construction Contractor Questionnaire* and *Pricing Grading Sheet* and provide an organized and complete bid.

A Bid Bond in the amount of **5%** is **required** with your bid response; failure to do so will deem your bid non-responsive. A Performance, Payment and Maintenance Bond (2 yr.) will be required upon notification of award.

Completion is defined as all wire work complete and circuits energized. Cleanup and other tasks not requiring a line clearance are to be completed no later than thirty (30) days following completion of wire work and energization.

RETAINAGE: As security for the faithful completion of the work by the CONTRACTOR, the OWNER shall retain ten percent (10%) of the total dollar amount of work done on all contracts less than $200,000.00; five percent (5%) of the total dollar amount of work done on all contracts of $200,000.00 or more.

Documents

13 files

Subscribe to get these 13 documents.

  • Bid Invitation.pdf
    Download
  • IFB_Centerville_Oates.pdf
    Download
  • Performance Bond Example.pdf
    Download
  • GPL Standard Requirements T-line.docx
    Download
  • City of Garland Terms Conditions V1058 - OCA Rev - Services.pdf
    Download
  • 2 Year Maintenance Bond Example.pdf
    Download
  • GPL Construction Contractor Questionnaire.docx
    Download
  • Payment Bond Example.pdf
    Download
  • GPL Standard Tline Technical Specs.docx
    Download
  • Garland Power and Light Safety Compliance Addendum.pdf
    Download
  • GPL Construction Evaluation Criteria Scoring.xlsx
    Download
  • Notice to Bidders Document.docx
    Download
  • Centerville-Oates 138 kV Construction Bid Units.xlsx
    Download

Similar open bids

In Texas

More from City of Garland

Open bids