Water Treatment Support Services

Active REQ00003565 IFBUtilities & EnergyCity of Garland
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Garland (Texas) posted this IFB on Nov 16, 2026. Responses are due Dec 8, 2026. Category: Utilities & Energy. Questions are due 2026-12-03 12:00. Solicitation number REQ00003565.

Solicitation details

General information

Solicitation number
REQ00003565
Notice type
IFB
Place of performance
Texas
Questions due
2026-12-03 12:00

Agency and category

Agency
City of Garland
Category
018Utilities & Energy
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

This Statement of Work (SOW) establishes the requirements for Water Treatment Support Services for Ray Olinger Power Plant and Spencer Generating Station to maintain continuous, reliable, and compliant operation of the facility's water treatment systems.

The contractor shall provide qualified technical personnel, equipment, chemicals, and associated services necessary to support deionized (DI) water production, system monitoring, preventive maintenance, and emergency response activities.

Scope

Scheduled Monthly Service Visits

The contractor shall perform a minimum of one (1) scheduled technical service visit per month at each facility. Each visit shall include, at minimum, the following activities:

  • Visual inspection of all water treatment system components, including tanks, valves, piping, instrumentation, and control panels
  • Review and documentation of system operating parameters (flow rates, pressure, conductivity, pH, hardness, etc.)
  • Verification that all safety devices and emergency shutoffs are functional
  • Inspection of chemical feed systems, including pump calibration verification
  • Collection and field analysis of water samples at designated sampling points
  • Review of any alarms, system faults, or operational issues since the last visit
  • Inspection of filter housings, membrane housings, or media beds as applicable
  • Lubrication and mechanical inspection of pumps, motors, and rotating equipment
  • Submittal of a written service report within five (5) business days of each visit (see Section 8)

Water Quality Testing

The contractor shall conduct water quality testing at each monthly visit and as otherwise required. [...]

Preventive Maintenance

The contractor shall perform scheduled preventive maintenance (PM) activities as part of the monthly service program. A PM schedule shall be developed during the contract startup phase and maintained throughout the contract period.

Boiler Water Chemistry Program

The contractor shall provide full boiler water chemistry support for all operating boiler systems at Ray Olinger Power Plant and Spencer Generating Station. [...]

Cooling Tower Water Chemistry Program

The contractor shall provide full cooling tower chemistry support for all cooling tower systems at both facilities. [...]

DI Tank Exchange Services

The contractor shall provide deionized (DI) water tank exchange services to ensure continuous availability of high-purity DI water at the facility. Tank exchange services shall include delivery of fully regenerated DI tanks and removal of exhausted tanks on a schedule that prevents interruption of DI water supply.

Activation Protocol

Within the first thirty (30) days of contract award, the contractor shall complete the following activation activities: [...]

Additional information

**NO FAXED OR EMAILED BIDS!** All documents (forms) herein and attached are **required** to be completed and returned with response.

All questions must be answered in the Ion Wave Q&A segment. No emailed, faxed or phone call question related to this bid will be responded to.

Valid Certificates of Insurance are **required** prior to issuance of a Purchase Order, but not to place a bid.

This is a Best Value Bid. Please pay close attention of the evaluation criteria. Please acknowledge the City of Garland's Terms and Conditions in the "Attributes" section.

Bid Submission Requirements

Each bid submission shall include:

1. Company profile and relevant experience summary
2. Resume(s) or qualification summary for SME personnel assigned to this contract.
3. Proposed service schedule and staffing plan
4. Detailed pricing in the format specified in Section 10
5. References from at least three (3) similar contracts performed within the past five (5) years
6. Safety program summary or written safety plan

Contract Term

The initial contract term shall be one (1) year from the date of award, with options to renew for up to three (3) additional one-year periods, subject to satisfactory performance and mutual agreement.

Documents

5 files

Subscribe to get these 5 documents.

  • Bid Invitation.pdf
    Download
  • REQ00003565 (Water Treatment Support Services) Bid Sheet.xlsx
    Download
  • City of Garland Terms Conditions V1058 - OCA Rev - Services.pdf
    Download
  • REQ00003565 (Water Treatment Support Services) ScopeFinal.pdf
    Download
  • REQ00003565 NTB PDF V.1.pdf
    Download

Similar open bids

In Texas

More from City of Garland

Open bids