Lehi City (Utah) posted this RFP on Nov 5, 2026. Responses are due Dec 8, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-17 17:00. Solicitation number Lehi 2026-11.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Lehi City is seeking a qualified Design-Build Contractor to design and construct a trailhead in the new Inverness development by DR Horton. The project will provide parking, trail access, visitor amenities, and gathering space while creating an attractive transition between the developed community and the surrounding native mountain landscape. This trailhead is expected to be a practice location for local NICA teams and should be approached with that in mind.
The City has prepared a preliminary concept plan, included as Exhibit A, to communicate the general project vision and anticipated amenities. The concept is illustrative only and is not intended to prescribe the final site layout. Site grades and conditions have changed from those originally anticipated. The selected Design-Builder shall evaluate the existing conditions and develop an improved, constructible design that meets the City's objectives.
The Design-Builder shall provide all professional design services, engineering, construction, materials, labor, equipment, and project coordination necessary to deliver a complete and operational trailhead park. The Design-Builder shall retain qualified design professionals, including a licensed landscape architect and appropriate engineering consultants.
The project shall include, at a minimum, the following:
The Design-Builder shall submit a preliminary site plan, grading concept, landscape concept, proposed parking count and dimensions, and preliminary cost estimate for City review. Final construction documents and design shall be approved by the City prior to construction.
**Required** method is to submit electronically through Bonfire at https://utah.bonfirehub.com/ by **December 8, 2026 5:00 PM MST**. Proposals received after the submission deadline will not be considered.
Proposals must include a *Preliminary Concept Plan*, a letter of transmittal, project team, references and qualifications, timeline, cost proposal, and financial report. The cost proposal submitted should be the itemized *Bid Summary Sheet*. The anticipated project budget is approximately **$1,000,000 to $1,200,000**.
The representations contained in Section 3, and submitted pursuant to this RFP, shall be binding upon each respective respondent for (a) sixty (60) days from the submission deadline or (b) until the successful respondent and the City enter into an agreement pursuant to this RFP, whichever occurs first.
**Evaluation criteria:** the respondent's relevant qualifications; professional reputation; quality of goods and services proposed; ability, capacity, and skill to provide the Scope of Work; sufficiency of financial resources; any litigation, prosecution, or other claims; availability and proposed schedule of completion; ability to provide future maintenance and service; the proposed RFP pricing; and which proposal will provide the best economic advantage to the City.
**Bonds and insurance:** the contractor must provide a performance bond and a payment bond in the amount of the Payment, and a warranty bond/warranty letter of credit in the amount of 10% of the Payment. General Liability insurance of not less than **$3,000,000** per occurrence and **$3,000,000** aggregate, commercial automobile liability of at least **$1,000,000**, and employer's liability of not less than **$1,000,000**.