NC27-130 ROCKY CANYON AERIAL SEEDING WRI 8068

Active NC27-130 IFBLandscaping & AgricultureUtah Division of Wildlife Resources
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Utah Division of Wildlife Resources (Utah) posted this IFB on Nov 25, 2026. Responses are due Dec 9, 2026. Category: Landscaping & Agriculture. Solicitation number NC27-130.

Solicitation details

General information

Solicitation number
NC27-130
Notice type
IFB
Place of performance
Utah

Agency and category

Agency
Utah Division of Wildlife Resources
Category
017Landscaping & Agriculture
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Utah Division of Wildlife Resources (UDWR) is acquiring services in this contract to pick up, transport and aerial seed treatment areas within the Rocky Canyon Fire scar that occurred in 2026 near Morgan and Henefer, Utah. Bids should be submitted on a **per acre basis**.

This project is located on private and UDWR lands in Morgan and Summit County, Utah. [...] The seed mix, consisting of grasses, shrubs, and forbs, will be applied at a rate of approximately 7 lbs/acre over 1,646 acres of UDWR lands and 2,821 acres of private lands. [...] Total acres equal 4,467 acres.

Scope

Location and Access

Elevation ranges from 5,300 to 8,200 feet, with the elevation of the LZ1/Fuel staging area being 6,105 feet. The staging area can be changed if needed.

Staging Area/LZ1: 12 T 451400 m E 4531837 m N, Lat/Long (40.93622, -111.57731)

The main access route is west of Henefer City, Utah on Hwy 65. Turn right to stay on Hwy 66 to access the LZ1/Fuel staging area. Access will be on the right near East Canyon State Park and will need coordination with UDWR to access the staging area.

Seeding

The seed mix, consisting of grasses, shrubs, and forbs, will be applied at a rate of approximately 7 lbs/acre [...]. Helicopters used must be capable of seeding at these rates. Total acres equal 4,467 acres.

Total Weight: Approximately 31,537 lbs.

The helicopter **must** be equipped with a global positioning system that is used to establish flight lines for 100% coverage.

Seeding Dates: **December 9 to December 31, 2026.** The UDWR will coordinate start date(s) with timing of seed availability.

Seed Pick-up

The responsibility of the winning contractor to pick the seed up from the Great Basin Research Center in Ephraim, UT (494 W 100 S, Ephraim, UT 84627) during regular business hours, Monday through Thursday. Seed will be pre-mixed and supplied in bulk totes. Each tote will range from 1,250 to 1,700 lbs. The contractor will be responsible for providing necessary equipment and personnel to unload and load seed.

Contractor Responsibilities

The Contractor shall furnish all labor, equipment, supervision, transportation, operating supplies and incidentals to perform all work as set forth in the specifications.

The contractor shall maintain adequate records to allow the UDWR to monitor contract progress and for the contractor to be accountable for work quality.

The contractor shall designate one English literate supervisor who will be on-site during operation hours.

Work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset.

Additional information

Submission and Award

All questions related to this solicitation, specifications, or bidding procedures **MUST** be asked in writing in U3P.

This contract will be bid on an average per acre rate and total project cost basis. Per acre and total bid prices will include all mobilization and operation costs. There will be no fuel surcharges or adjustments negotiated. Potential bidders must have experience on similar projects. The contract will be awarded based on bid price to the responsible and responsive bidder.

Site Visit

**Mandatory** site visits must be attended in person by an authorized representative of the person or vendor submitting a bid. [...] Any prospective bidders who arrive late to the meeting will not be allowed to continue with the site visit nor submit a bid.

Insurance

  • Workers’ compensation at statutory limits.
  • Commercial general liability of no less than **$1,000,000.00** per person per occurrence and **$3,000,000.00** aggregate.
  • Commercial automobile liability of **$1 million** per occurrence, if a vehicle is used.

Contract Time and Payment

The Contractor shall begin work within seven (7) calendar days from the effective date of the notice to proceed.

Payment will be made in one lump sum at completion of the project.

Budget: **$80,000**

Documents

3 files

Subscribe to get these 3 documents.

  • Att.-A-PO-Terms-and-Conditions.docx
    Download
  • Attachment B scope of work.docx
    Download
  • Vendor Prerequisites - IFB Agency.pdf
    Download

Similar open bids

In Utah

More from Utah Division of Wildlife Resources

Open bids