DFCM Construction - Prequalified Mechanical Stage II - Southern Utah University- AFEC AHU #7, #8 & Controls Upgrade - Project #27052730

Active CR27030 ITBConstruction - BuildingUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this ITB on Nov 25, 2026. Responses are due Dec 21, 2026. Category: Construction - Building. Questions are due 2026-12-11 15:00. Solicitation number CR27030.

Solicitation details

General information

Solicitation number
CR27030
Notice type
ITB
Place of performance
Utah
Questions due
2026-12-11 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids from Stage II Prequalified Mechanical Contractors for Construction services for the following project. Contractors not prequalified through the Stage I Request for Statement of Qualifications process are not eligible to bid on this project.

AFEC AHU #7, #8 & Controls Upgrade
Southern Utah University
Cedar City, UT
DFCM Project #27052730 | U3P Reference # CR27030

[...]

Remove and replace air handlers 7 & 8 at the SUU AFEC building.

[...]

Construction Budget: **$1,274,789.00**

Scope

Detailed Project Description/Base Bid

This project includes the removal and the associated fans, replacement of existing AHU-7 & AHU-8 and all associated items. The project shall also include re-balancing the existing vavs and supply grilles and diffusers associated with AHU-7 & AHU-8.

Additive Alternates: N/A

Construction start is May 3rd.

Project Requirements

  • DFCM Approved Fabricator List
  • DFCM Design Management Documents
  • DFCM Roofing Design Requirements
  • State of Utah High Performance Building Standard and all appendixes

[...]

The Work includes

  • Replace existing air handling units as shown in drawings
  • Provide new controls for new air handling units
  • Remove and replace and add new roof mounted relief fans as shown on plans

[...]

Owner will occupy site and existing building during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations.

[...]

Work shall be generally performed inside the existing building during normal business working hours of 8:00 a.m. to 5:00 p.m., Monday through Friday, except otherwise indicated.

Additional information

Substantial Completion Date: **August 6, 2027**. Liquidated Damages: **$750.00 per day**.

[...]

All prime Contractors wishing to bid on this project must attend and sign in at the **mandatory** meeting. Contractors not in attendance at this meeting are ineligible to bid on this project.

[...]

**Bids must be submitted via the U3P website** no later than the time and date specified on the Solicitation Schedule.

[...]

The Contract award will go to the Contractor submitting the lowest responsive and responsible bid.

[...]

A bid bond properly signed by the Contractor and a qualified surety and submitted on the *AIA Document A310 – 2010 Bid Bond* form in the amount of **5% of the bid**, or equivalent, must accompany the bid submitted within U3P.

[...]

All Contractors are **required** to submit their *DFCM Subcontractors List Form* to dfcmcontracts@utah.gov by **December 22, 2026, 3:00 PM**.

[...]

The Contractor is **required** to provide performance and payment bonds on the *AIA Document A312 - 2010 Performance and Payment Bond* forms in the amount of **100% of the Contract Sum**.

Documents

8 files

Subscribe to get these 8 documents.

  • 1-CR27030-27052730 Solicitation.pdf
    Download
  • 2-CR27030-27052730 Approved Plans.pdf
    Download
  • 3-CR27030-27052730 Approved Specifications.pdf
    Download
  • 4-CR27030-27052730 Hazmat Survey.pdf
    Download
  • A-DFCM General Conditions August 2020-Clean rev 07122023.pdf
    Download
  • B-Subcontractors List Form Instructions-7.1.2021.docx
    Download
  • C-DFCM Health Insurance Statement of Compliance Form
    Download
  • Revised 7.28.25.docx
    Download

Similar open bids

In Utah

More from Utah Division of Facilities Construction and Management

Open bids