NS27-140 Washington County Solid Waste District - Phase 3 Professional Engineering Design Services

Active NS27-140 RFQuArchitecture & EngineeringWashington County Solid Waste District
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Washington County Solid Waste District (Utah) posted this RFQu on Nov 25, 2026. Responses are due Dec 18, 2026. Category: Architecture & Engineering. Questions are due 2026-12-11 14:00. Solicitation number NS27-140.

Solicitation details

General information

Solicitation number
NS27-140
Notice type
RFQu
Place of performance
Utah
Questions due
2026-12-11 14:00

Agency and category

Agency
Washington County Solid Waste District
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Washington County Solid Waste District (District) invites Statements of Qualifications (SOQs) from qualified professional engineering firms to provide engineering design and related professional services for the Washington County Solid Waste Phase 3 improvements, consisting of Phase 3 West — Public Convenience Center (PCC) and Phase 3 East — Maintenance Yard Update. The District intends to select a firm through a qualifications-based process and negotiate scope and compensation after ranking firms.

The anticipated assignment includes coordinated design for both Phase 3 components, with potential bidding and construction-phase services as authorized in the final agreement. Respondents should demonstrate capacity to address both areas and coordinate design packages and construction sequencing as needed.

Scope

The project includes two components: (1) Phase 3 West — PCC Public Convenience Center improvements; and (2) Phase 3 East — Maintenance Yard Update. [...]

  • Phase 3 West — Public Convenience Center: evaluate existing conditions and develop improvements to the PCC operations, circulation, public access, grading, drainage, pavement, utilities, and associated site infrastructure, as directed by the District.
  • Phase 3 East — Maintenance Yard Update: evaluate existing maintenance yard conditions and develop improvements to operational layout, vehicle and equipment circulation, surfacing, grading, drainage, utilities, and supporting site infrastructure, as directed by the District.
  • Coordinate survey, geotechnical, structural, electrical, environmental, and other specialty services as needed for the confirmed Phase 3 West and Phase 3 East scopes.
  • Prepare coordinated design deliverables for both components, including plans, technical specifications, construction cost estimates, permitting materials, and any separate bid packages required by the District.
  • Provide bidding and procurement-phase assistance, including responding to contractor questions and supporting addenda, as authorized.
  • Provide construction administration, site observation, submittal review, change documentation, and closeout assistance for each Phase 3 component, as authorized.

The District may refine the scope before contract execution. No work is authorized until a written agreement and notice to proceed are issued.

Additional information

Submission

Submit SOQs to **U3P Portal** https://utah.bonfirehub.com/ by **[DECEMBER 18TH 2026, 2:00 PM MOUNTAIN TIME]**. Include “WCSW Phase 3 Engineering RFQ” in the submission subject or title. Submit one searchable PDF, suggested maximum 20 pages excluding cover, resumes, and required certifications.

Do NOT include fee schedules, hourly rates, or project pricing in the SOQ.

Evaluation Criteria

| Criterion | Maximum points |
| --- | --- |
| Relevant engineering and solid waste / public infrastructure experience | 20 |
| Local presence, availability, and responsiveness | 30 |
| Project manager and key personnel qualifications | 15 |
| Project understanding and technical approach | 20 |
| Past performance and references | 10 |
| Quality assurance / quality control | 5 |
| TOTAL | 100 |

The District may conduct interviews with firms that achieve a minimum score of 75 points out of 100 during the initial evaluation. [...] Following evaluation, the District will negotiate the scope of services and professional fee with the highest-ranked firm.

Insurance and Agreement

The selected firm will be **required** to execute a written professional services agreement with appropriate insurance, indemnification, ownership of documents, and termination provisions.

Documents

1 file

Subscribe to get this document.

  • Phase 3 - Engineering and Design.docx
    Download

Similar open bids

In Utah