SLCC RRC Light Pole Replacement Project Phase II, F26017

Active SLCC2026-W1030 IFBConstruction - BuildingSalt Lake Community College
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Salt Lake Community College (Utah) posted this IFB on Oct 22, 2026. Responses are due Dec 3, 2026. Category: Construction - Building. Solicitation number SLCC2026-W1030.

Solicitation details

General information

Solicitation number
SLCC2026-W1030
Notice type
IFB
Place of performance
Utah

Agency and category

Agency
Salt Lake Community College
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Salt Lake Community College (SLCC) is requesting bids for the construction of the following project: [...] Update Light poles and lighting per drawings and specs

**Additive Alternates:** 3 alternates SLCC reserves the right to award the alternates based on price, SLCC MAY choose not to award any or all of the alternates.

Scope

Update Light poles and lighting per drawings and specs

**Additive Alternates:** 3 alternates SLCC reserves the right to award the alternates based on price, SLCC MAY choose not to award any or all of the alternates.

  • Add pedestrian light poles North of the TB include everything needed for installation. (There is a longer lead-time on this project, if we include this alternate it will be tracked as a separate project with it's own substantial completion date)
  • Light pole and base demolition
  • Repair light pole bases. (This is the cost needed to repair light pole bases, and will be added as a change order if needed after demolition of existing light poles.)

SLCC Project Manager: Chris McCarty

Design Firm: Lynk Engineers

Construction Cost Estimate: $200,000

Liquidated Damages: $350.00

Tax Exempt: Yes

Additional information

Bids are to be submitted electronically until **4:30 pm on Thursday, December 3, 2026** through a secure mailbox on the U3P website. It is the sole responsibility of the contractor to ensure their bid reaches U3P before the closing date and time. There is no cost to the contractor to submit electronic bids via U3P. Bids may require the uploading of attachments. The submission of attachments containing embedded documents (i.e., zip files, .mov, wmp, and mp3 files, etc.) is prohibited. All documents should be attached as separate files.

A bid bond in the amount of five percent (5%) of the bid amount, made payable to Salt Lake Community College on the *AIA Document A310 – 2010 Bid Bond*, or equivalent, shall accompany the bid submission. If the bid bond is not uploaded with the bid through U3P, the bid is NONRESPONSIVE.

The successful bidder, simultaneously with the execution of the Contract Agreement, will be required to furnish a performance bond and a payment bond on the *AIA Document A312 - 2010 Performance and Payment Bond*, or equivalent. The performance and payment bonds shall be for an amount equal to one hundred percent (100%) of the contract sum.

The Contract will be awarded as soon as possible to the lowest, responsive and responsible bidder, based on the lowest combination of base bid and acceptable alternates, provided the bid is reasonable and in the best interest of SLCC.

Documents

7 files

Sign up free to get these 7 documents.

  • Certificate-of-Substantial-Completion (1).docx
    Download
  • Contractors-Agreement (1).docx
    Download
  • Invitation for Bid - RRC Light Pole replacement.docx
    Download
  • SALT LAKE COMMUNITY COLLEGE GENERAL BID PROVISIONS.pdf
    Download
  • SLCC Parking Lighting Upgrade Phase 2 Specs.pdf
    Download
  • SLCC Parking Ltg Upgrade Ph 2 Permit Set.pdf
    Download
  • Subcontractors+List (1).docx
    Download

Similar open bids

In Utah

More from Salt Lake Community College

Open bids