Salt Lake Community College (Utah) posted this IFB on Nov 3, 2026. Responses are due Dec 17, 2026. Category: Architecture & Engineering. Questions are due Refer to Project Schedule for deadline.. Solicitation number SLCC2026-W1029.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Salt Lake Community College (SLCC) seeks consultant services to investigate, survey, and map existing utilities at the Redwood, South City, Larry H. Miller, and Jordan campuses. The completed work shall provide coordinated utility maps and geographic information system (ARCGIS) data for facilities management and future project planning. Survey products shall be delivered in PDF and editable AutoCAD. Civil 3D-dependent files are not acceptable.
Utility coverage
The investigation shall address electrical distribution; culinary water; irrigation water mainlines; sanitary sewer; storm drainage; natural gas; telephone and communications; steam; and utility tunnels, where present within the agreed survey limits. Identify associated accessible features, including valves, meters, hydrants, manholes, inlets, cleanouts, vaults, and utility entry points. [...] Irrigation investigation and mapping are limited to mainlines and associated mainline appurtenances. [...] Interior building distribution is not included in the survey.
Records review and coordination
Review available utility drawings, previous surveys, record documents, and facilities information. [...] Submit a work plan and campus sequencing schedule before fieldwork, including personnel, equipment, access requirements, survey control, and quality-control procedures.
Investigation and survey methodology
Describe the proposed combination of electromagnetic locating, ground-penetrating radar, and other appropriate methods. [...] Identify the proposed and achieved utility information quality levels using the ASCE 38-22 framework, Quality Level A. [...] Identify unit costs for potholing or vacuum excavation needed to resolve critical uncertainties.
Maps and digital deliverables
Provide a composite utility map for each campus and separate utility layers or views. Include an Excel file of the campus, utility types, survey date, legend, investigation limits, and unresolved conditions. [...] Deliver searchable PDF maps and an editable AutoCAD DWG, latest published version. Files shall remain usable without Civil 3D, Civil 3D object enablers, or unresolved proxy objects.
ARCGIS dataset and supporting information
Provide georeferenced utility features with consistent identifiers linking maps and ARCGIS records. [...] Supply a data dictionary, coordinate-system information, survey control records, relevant field photographs, and the investigation and limitations log.
Review and completion
Submit draft maps and data for SLCC review, correct errors, and address review comments before final delivery. Provide an itemized transmittal signed by an authorized consultant representative and a handoff meeting explaining file organization, use, and limitations.
Submission
Bids are to be submitted electronically until **2:00 pm on Thursday, December 17, 2026**, through a secure mailbox on the U3P website. It is the sole responsibility of the contractor to ensure their bid reaches U3P before the closing date and time. The submission of attachments containing embedded documents (i.e., zip files, .mov, wmp, and mp3 files, etc.) is prohibited. All documents should be attached as separate files.
Bid bond
A bid bond in the amount of **five percent (5%) of the bid amount**, made payable to Salt Lake Community College on the *AIA Document A310 – 2010 Bid Bond*, or equivalent, shall accompany the bid submission. If the bid bond is not uploaded with the bid through U3P, the bid is NONRESPONSIVE.
Pre-bid meeting
A **MANDATORY** pre-bid meeting will be held online. All contractors wishing to bid on this project must attend this meeting.
Fee proposal
The fee proposal shall provide a separate total for each utility covering all four campuses. [...] Provide the combined base fee, exclusions, and separately priced optional investigations. [...] SLCC will select individual utility assignments.
Other
Pricing must be guaranteed for ninety (90) days from the close date of this solicitation unless otherwise noted in the solicitation. [...] **Construction Cost Estimate: $230,000**. Completion Time: TBD.
Sign up free to get these 6 documents.