Port Orchard Marina Breakwater Replacement, Re-Bid

Active 03-15-0224-R IFBConstruction - Heavy & CivilPort of Bremerton
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Port of Bremerton (Washington) posted this IFB on Oct 27, 2026. Responses are due Nov 24, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-16 17:00. Solicitation number 03-15-0224-R.

Solicitation details

General information

Solicitation number
03-15-0224-R
Notice type
IFB
Place of performance
Washington
Questions due
2026-11-16 17:00

Agency and category

Agency
Port of Bremerton
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Port of Bremerton is seeking bids for a breakwater replacement project at the Port Orchard Marina. This project will include new north and east breakwaters, and may include approach floats, a new gangway, and demolition of the existing structures and utilities.

This solicitation is a “Re-Bid” of project 03-15-0224, however, modifications to the former contract documents have been made in numerous parts. No former project 03-15-0224 contract document components, including all former addenda, will be considered applicable to this new request for bids.

**Estimated cost:** $20,000,000 to $25,000,000 (Incl. WSST)

Scope

The breakwater, approach floats, and gangways are performance specified for the fabricator's final design. The anchoring system for the floats is fully designed as well as the float utilities. Utility infrastructure includes dock water systems, dock fire systems, sewer forcemain, and electrical. The upland utility work includes temporary erosion and sediment control (TESC); existing utility protection, and site restoration, including paving and landscaping. The project mitigation components may include the demolition of two timber piers located within one mile of the site.

Additional information

**Submission method:** Bids are to be submitted electronically through https://mrscrosters.bonfirehub.com. Bidders must create a login to submit a bid. The original bid bond hard copy is due to the Port before the bid deadline and is not to be received electronically. Deliver bid bonds labeled with bid opportunity “#03-15-0224-R Port Orchard Marina Breakwater Replacement” to: Attn: Tim Petrick, Port of Bremerton, 8850 SW State Hwy 3, Bremerton, WA 98312. Bids sent via e-mail are not accepted.

Bid prices will be publicly read following the proposal submission deadline at Airport Terminal Conference Room, 8850 SW State Hwy 3, Bremerton, WA 98312. The bid opening will also take place virtually.

Sealed bids must be uploaded electronically. Bids cannot be accepted if submitted by hard copy, mail, facsimile, or email. Late Bids will not be accepted, nor will additional time be granted to any individual Bidder.

Prevailing Wage Provision: The workers of all contractors and subcontractors on all Port "public works" as defined by RCW 39.04.010, shall be paid the "prevailing rate of wage" including "usual benefits" and overtime, paid in the locality as those terms are defined by Chapter 39.12 RCW. [...] Davis-Bacon Act, as amended (40 U.S.C. 3141-3148): In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor.

Documents

5 files

Sign up free to get these 5 documents.

  • Invitation for Bid 03-15-0224-R Port Orchard Marina Breakwater Replacement.pdf
    Download
  • PART VII Drawings 026-05-15 Bid Schedule D Mitigation Pier Demo Plans-.pdf
    Download
  • PART VII - Drawings Port Orchard Marina Breakwater Replacement 10-26-2026.pdf
    Download
  • PART VII - Drawings Port Orchard Marina Breakwater Replacement Re-Bid Sealed Drawings 10-26-2026 UNLOCKED.pdf
    Download
  • Re-Bid Reference Only Drawings.pdf
    Download

Similar open bids

In Washington

More from Port of Bremerton

Open bids