Construction Manager at Risk for Harquahala Valley Water Supply Wells & Conveyance Pipeline

Active 27RFSQ117 RFSQConstruction - Heavy & CivilCity of Scottsdale
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Scottsdale (Arizona) posted this RFSQ on Nov 13, 2026. Responses are due Dec 14, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-30 10:00. Solicitation number 27RFSQ117.

Solicitation details

General information

Solicitation number
27RFSQ117
Notice type
RFSQ
Place of performance
Arizona
Questions due
2026-11-30 10:00

Agency and category

Agency
City of Scottsdale
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Scottsdale is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction and complete construction phase services for the City of Scottsdale’s Harquahala Valley Water Supply Wells and Conveyance Pipeline project in La Paz County, Arizona to construct water improvements, including two production wells, pipelines, and support infrastructure facilities to extract groundwater from a CITY-owned parcel of land in the Harquahala Valley and convey it into the Central Arizona Project (CAP) canal.

The City is seeking a licensed contractor with experience in constructing production well sites, large-diameter pipelines, ancillary infrastructure (electrical, mechanical, and communication), and on-site groundwater treatment facilities at remote locations, including U.S. Bureau of Reclamation (BOR) land, under an aggressive schedule. The estimated cost of improvements for this project is approximately thirty-two million dollars (**$32,000,000**).

Scope

This project will install approximately 13,000 linear feet of new 16-inch diameter raw water pipeline within the right-of-way (ROW) of a future county roadway, construct 2 new Well Sites (the Wells have been drilled and tested but not equipped), and construct a CAP Turn-In Structure for wheeling non-project water within the CAP canal. Ancillary electrical, instrumentation, and control systems will be included as designed.

**Pre-Construction Phase Services:** The selected CMAR will collaborate closely with the Owner and Design Engineer. Pre-construction phase services may include but are not limited to the following:

  • Review the improvement plans as prepared by Carollo Engineers (*Exhibit E*) to provide constructability reviews at 60% and 90% design intervals, value engineering options, assist in the development of phasing, identify long lead items for procurement, and develop a construction delivery schedule to assist the City with delivering the project in a timely manner.
  • Coordinate with utility companies and regulatory agencies for conflicts and permitting.
  • Provide detailed cost estimating and knowledge of marketplace conditions.
  • Sub-contractor bidding and procurement plan.
  • Risk mitigation plan.
  • Provide transparent and open-book CMAR’s Guaranteed Maximum Price (GMP) or multiple GMPs.

**Construction Phase Services:** Construction elements may be delivered via one or more contracts, and the CMAR will assume the risk and be responsible for delivering the project using a Guaranteed Maximum Price (GMP). The CMAR will develop a GMP for each construction contract. The CMAR will be responsible for construction means and methods to meet the project goals. The CMAR is expected to follow a subcontractor selection plan (developed by the CMAR) that solicits bids from prequalified subcontractors to perform the work and may include but are not limited to the following:

  • Arrange for procurement of materials and equipment.
  • Schedule and manage site operations.
  • Manage sub-contractors.
  • Provide quality controls.
  • Bond and insure the construction.
  • Address all federal, state and local permitting and regulating requirements.

**Deliverables:** Pre-construction phase deliverables include constructability review reports, detailed cost estimate(s), value engineering proposals, baseline project schedule, long lead procurement list and plan, and GMP proposals. [...]

The final deliverable will be a GMP proposal, phase plan and schedule to complete the scope of work based on final plans and agreed upon by city staff.

Additional information

**Submission method:** Reply to this request with an electronic Statement of Qualifications submittal which is not more than eight (8) pages plus a one-page cover letter. Maximum document size is **10 MB**. The electronic submittal shall be submitted in **Adobe PDF format through the Bonfire (Euna) system**: https://www.scottsdaleaz.gov/purchasing/procurement.

Submittals must be received no later than **10:00 AM, local time, Monday, December 14, 2026**.

Selection Criteria

  • CMAR’s Relevant Experience and Qualifications (300 Points max.)
  • Experience of Key Personnel to be Assigned to this Project (250 Points max.)
  • Project Understanding & Approach to Performing the Required Services (300 Points max.)
  • Subcontractor Selection Plan (50 Points max.)
  • Overall Evaluation (100 Points max.)

A selection committee will evaluate and score each SOQ according to the Selection Criteria set forth above to determine a shortlist of at least three (3) but not more than five (5) firms for the interview phase of the selection process.

The City will require posting of **Payment and Performance Bonds** in conformance with the requirements of A.R.S. § 34-608.

The SOQ submittal must include a signed *Non-Collusion Affidavit* (*Exhibit B*) and *Addenda Acknowledgement*, if applicable (*Exhibit A*).

There will not be a pre-submittal meeting for this solicitation.

Documents

1 file

Subscribe to get this document.

  • 27RFSQ117 CMAR HARQUAHALA VALLEY WATER SUPPLY WELLS CONVEYANCE PIPELINE.pdf
    Download

Similar open bids

In Arizona

More from City of Scottsdale

Open bids