Maricopa County Community College District (Arizona) posted this RFP on Nov 13, 2026. Responses are due Jan 8, 2027. Category: Construction - Heavy & Civil. Questions are due 2026-12-04 17:00. Solicitation number 3637-6.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Maricopa County Community College District (MCCCD or District) and Phoenix College (PC) intends to engage the services of a contractor to assess, design, furnish, and install an irrigation pump system capable of utilizing available flood irrigation water to supplement or replace potable water currently used within the College's existing irrigation infrastructure.
The primary purpose of this project is to reduce potable water consumption and associated costs by utilizing available flood irrigation water, where feasible, as an alternative water source for landscape irrigation. The proposed system shall provide adequate water pressure and flow to designated irrigation zones while maintaining the reliability, efficiency, and operational integrity of the existing campus irrigation infrastructure.
The initial project contemplated under this Scope of Work is located at Phoenix College (PC).
The selected contractor shall be responsible for evaluating existing conditions, determining system requirements, recommending appropriately sized equipment, and providing a complete, fully operational pump system.
The selected contractor shall provide all labor, materials, equipment, supervision, technical expertise, coordination and other services necessary to complete the project in accordance with the approved scope.
The contractor shall identify all work necessary to deliver a complete, functional system, including any work associated with the water source connection, pumping equipment, electrical infrastructure, controls, distribution piping, permitting, and required inspections.
Site Assessment and Existing Conditions
The contractor shall:
Pump System Design and Equipment Selection
The contractor shall:
An unprotected direct interconnection between the flood irrigation water system and potable water distribution system shall not be permitted.
Submission
MCCCD uses a portal hosted by Euna Procurement (formerly Bonfire) for accepting and evaluating proposals. It shall be the responsibility of the Proposer to confirm that proposals contain all required documents and are submitted electronically through the MCCCD Procurement Portal. Your proposal must be completed and uploaded to our site no later than **3:00 P.M. (local time)**. Submissions after this date and time will automatically be rejected by the system.
No proposal shall exceed forty (40) typewritten pages in length plus any pricing schedule(s), exhibits, resumes, proposed draft revenue sharing agreement, or attachments.
Award
The award shall be made on the proposal(s) that serves the best interest of the District and will not be evaluated solely on a monetary basis. Oral presentations will be evaluated.
Term
It is the intent of the District to award a 1-year contract for a total potential contract term of five (5) years. No billable work is to be done without a signed PO and scope of work.
No proposal may be withdrawn or modified after that deadline and shall be binding upon Proposer for a period of ninety (90) days after due date.
The pre-proposal meeting is NOT a Mandatory Meeting, but Site Tour will follow.