City of Prescott (Arizona) posted this IFB on Oct 30, 2026. Responses are due Dec 10, 2026. Category: Construction - Building. Solicitation number OpenGov-3d488655.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Prescott Regional Airport (PRC) is soliciting for construction of an Executive Hangar Development. The project will consist of a 4-unit, 16,315 square foot hangar development project.
The hangar shall be a pre-engineered steel building. The pre-engineered steel building will be based upon architectural performance specifications and not a single-source steel manufacturer. The hangar shall have a water fire suppression system along with interior floor drains with 1,500 gallon oil and water separator.
Civil site improvements consists of grading, drainage, utilities, aircraft taxi lane pavement and security fencing. Also included is a concrete aircraft wash rack with water and drainage improvements.