City of Sacramento (California) posted this IFB on Oct 16, 2026. Responses are due Nov 18, 2026. Category: Construction - Building. Solicitation number B27191121002.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The work described in these Special Provisions consists of the removal and replacement of the restroom at Warren Park, located at 160 45th Street in Sacramento. The project includes demolishing the existing restroom building and the associated concrete flatwork.
Additional improvements include grading and preparing the pad/subgrade for the new restroom building; installing sewer, water, and electrical connections; coordinating the new restroom building installation with the Public Restroom Co.; placing aggregate base and new concrete flatwork around the new restroom; and constructing a 12” mow band.
The work also includes providing a portable restroom and handwashing station for public use during the construction period and relocating existing turf rotors, turf sodding, and a 30-day landscape maintenance for the new turf.