City and County of San Francisco (California) posted this RFQ on Sep 2, 2026. No response date is listed. Category: Construction - Building. Solicitation number SFGOV-0000011919.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The project includes three major scopes of work as summarized herein:
1011 Turk Street Switchboard, UPS2, and HVAC Replacement
The project includes three major scopes of work as summarized herein:
1. Replacement of the existing low-voltage switchboards serving the facility, including associated feeder modifications, terminations testing, and commissioning. The work also includes temporary power provisions, phased shutdown sequencing, and cutover coordination to maintain facility operations during construction.
2. Like-for-like replacement of Uninterrupted Power System (UPS) 2, relocation of a new like-for-like low voltage transformer replacement, and electrical connections to new mechanical equipment.
3. HVAC equipment replacement and improvement in the Telecom Room, Server Room, and UPS1 Room. The work includes air duct and AHU modifications, installation of new air circulation between the Server Room and Telecom Room, system integration with the existing BMS, testing, and commissioning; the work also includes power distribution system and HVAC equipment cutover coordination.
The time allowed for completion is **600 consecutive calendar days**. The estimated construction cost is approximately **$7,800,000**.
Class "B" license is **required** to bid.
Notices regarding Addenda will be and other proposal changes will be posted on https://bidopportunities.apps.sfdpw.org, as well as sent to email addresses that download the contract documents via the ShareFile link above. It is the responsibility of Proposers to confirm receipt of any and all Addenda issued for this RFQP.
No contractor or subcontractor may be listed in a bid for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].