Hazel Avenue at U.S. 50 Interchange Segment 1 Tree Removal Project

Active 41022 IFBLandscaping & AgricultureCounty of Sacramento
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

County of Sacramento (California) posted this IFB on Oct 26, 2026. Responses are due Nov 12, 2026. Category: Landscaping & Agriculture. Questions are due 2026-11-03 14:00. Solicitation number 41022.

Solicitation details

General information

Solicitation number
41022
Notice type
IFB
Place of performance
California
Questions due
2026-11-03 14:00

Agency and category

Agency
County of Sacramento
Category
017Landscaping & Agriculture
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County.

The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and other incidental work for: Hazel Avenue at U.S. 50 Interchange Segment 1 Tree Removal Project

Scope

The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for:

Project work includes traffic control, tree removal with stump two feet above grade to remain, and doing all other work specified on the plans in the specifications.

Other items or details not mentioned above that are required by these Special Provisions shall be performed, placed, constructed, or installed in accordance with the Standard Construction Specifications and these Special Provisions.

Base Bid

| Line Item | Description | Quantity | Unit |
| --- | --- | --- | --- |
| 1 | TRAFFIC CONTROL PLAN & IMPLEMENTATION | 1 | LS |
| 2 | ESA FENCING | 954 | LF |
| 3 | 6" OR LESS DBH TREE REMOVAL | 3 | EA |
| 4 | OVER 6" TO <12" DBH TREE REMOVAL | 18 | EA |
| 5 | 12" TO <18" DBH TREE REMOVAL | 13 | EA |
| 6 | 18" TO <24" DBH TREE REMOVAL | 6 | EA |
| 7 | 24" TO <30" DBH TREE REMOVAL | 10 | EA |
| 8 | 30" TO <48" DBH TREE REMOVAL | 4 | EA |
| 9 | 48" AND ABOVE DBH TREE REMOVAL | 4 | EA |

Additional information

**Submission method:** SUBMIT ELECTRONIC RESPONSES VIA THE SACRAMENTO COUNTY ELECTRONIC BIDDING PORTAL (SACCOUNTYEBIDS). BIDDERS MUST ELECTRONICALLY SUBMIT THEIR BID ONLINE NO LATER THAN **2:00 PM** ON THE DAY OF THE BID. Responses delivered by hand, fax, telephone, e-mail, or any postal carrier will not be accepted.

ESTIMATED CONSTRUCTION COST: **$150,000.00**

CONTRACTOR LICENSE REQUIRED: **C-49 or C-61/D-49**

BASIS FOR AWARD: The basis for award shall be base bid only, with no additive or deductive items, or no consideration of additive or deductive items. If the Agency awards the contract, the award is made to the lowest responsible and responsive bidder.

**Bid guarantee:** Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid.

**Bonds:** The successful bidder shall be required to execute a material and labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price.

**Insurance:** General Liability each occurrence $2,000,000 and general aggregate $4,000,000; Automobile Liability combined single limit $2,000,000.

**Contract time:** the time for completion of this contract shall be Twenty (20) working days. Liquidated damages are $2,800.00 per day.

There is no pre-bid meeting for this project.

Documents

3 files

Sign up free to get these 3 documents.

  • Hazel_Seg1_Tree_Removal_CUPCAA_Project_-_Plans_Signed.pdf
    Download
  • Hazel_Seg1_Tree_Removal_CUPCCAA_Project_-_Special_Provisions.pdf
    Download
  • Hazel_Avenue_at_U.S._50_Interchange_Segment_1_Tree_Removal_Project.pdf
    Download

Similar open bids

In California

More from County of Sacramento

Open bids