Boulder Canyon Trail Repair Project

Active BID-326-26 ITBConstruction - Heavy & CivilBoulder County
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Boulder County (Colorado) posted this ITB on Oct 27, 2026. Responses are due Nov 20, 2026. Category: Construction - Heavy & Civil. Solicitation number BID-326-26.

Solicitation details

General information

Solicitation number
BID-326-26
Notice type
ITB
Place of performance
Colorado

Agency and category

Agency
Boulder County
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Boulder County Parks and Open Space Department (BCPOS) is soliciting proposals from qualified and experienced construction contractors for the repair and reconstruction of a damaged segment of the Boulder Canyon Trail and its associated creekside slope protection wall. The project site is located downstream of the intersection of HW 119 and Fourmile Canyon Drive, immediately east of the HW 119 trail underpass. The affected trail section sustained significant scour, creating a substantial void beneath the finished trail surface as it approaches an existing bridge abutment. In addition, the creekside slope containment structure at this location has been compromised and requires full, permanent reconstruction. Contractors must incorporate protective measures for two existing City of Boulder waterlines that run beneath and through the project area.

Scope

The proposed scope of work includes construction of a properly engineered and grouted boulder slope protection wall adjacent to the existing bridge abutment, as well as restoration of the approach trail to its pre scour condition.

The Project Consists of:

1. Construction of grouted boulder slope containment wall.
2. Construction of trail approach impacted by scour and any associate site activities.
3. Reclamation of all disturbed areas with different identified native seed mixes.

Major items of work include, but are not limited to:

1. Secure applicable permits prior to construction startup.
2. Mobilization and project controls.
3. Operation of a curtesy shuttle for duration of project to ensure the public who use the trail to commute have a safe route around the closure.
4. Site preparation includes a pre-construction survey, necessary Best Management Practices (BMPs)/Stormwater Control Measures (CMs).
5. Access for heavy machinery and materials by way of existing low water crossing East and downstream of concentrated project work site. Return Low Water Crossing to pre-project condition or better.
6. PROTECTION OF EXISTING 16" CITY OF BOULDER HIGH PRESSURE WATER LINES (2EA.)
7. Clearing and grubbing within limits of disturbance.
8. Demolition and removal of existing temporary repair structures.
9. Unclassified excavation in conformity with the lines and grades shown in the construction drawings.
10. Dewatering temporary excavations.
11. Placement of structural materials as specified for linear/vertical construction.
12. Hauling excess material to predetermined disposal site.
13. Installation of perimeter control for resource preservation.
14. A minimum of one (1) year guarantee and warranty will be required for any re-vegetation efforts for survival rates.
15. Restoration of internal access/haul routes, staging areas and demobilization.

Deliverables:

1. Critical path construction schedule – Prior to mobilization
2. Copy of all applicable permits/Traffic Control Plans's – Prior to mobilization
3. Complete submittal log – Prior to mobilization
4. Confirmation of operational shuttle service for trail users impacted by trail closure – Prior to mobilization.

Additional information

**Schedule:** The tentative schedule for construction is late December 2026, Through February 26, 2027, unless weather or permit procurement delay the start and will go through cold weather conditions dependent upon final contract award and Notice to Proceed.

The date of completion will be based on the date of Notice to Proceed. The project will allow a 44-day calendar schedule. Time is of the essence so the County will likely allow work 7-days a week per written request.

Permitting will commence within (3) days of the date of the execution of the Contract and upon written Notice to Proceed from the County. All Contractor-required permit applications will be submitted to applicable approval agencies within ten (10) days of the execution of the Contract and upon written Notice to Proceed from the County. Project mobilization will commence within (4) days of approval of all Contractor-required permits.

Contractor work hours shall be designated as Monday through Friday, 8:00 a.m. to 5:00 p.m. Work on Saturdays and Sundays, nights, and designated Federal Holidays shall not be allowed unless approved, in writing, by the County.

Contractor is required to disclose to County the complete business name(s) of all potential subcontractors that will be assigned to this Project, should the Contractor be selected.

The selected Contractor will be responsible for providing a base line schedule to the County's representative at the pre-construction meeting. The meeting will be held at the Boulder County Parks and Open Space Administrative Building at 5201 St. Vrain Road, Longmont, Colorado 80503.

Documents

13 files

Sign up free to get these 13 documents.

  • 1. BID-326-26 Instruction Information.pdf
    Download
  • 2. BID-326-26 Specifications.pdf
    Download
  • 3. BC Exhibit A Boulder Canyon Trail Repair Project 2924.pdf
    Download
  • 4. Boulder County Construction Sample Contract.docx
    Download
  • Attachment A - Boulder County Trail Repair Plan Set Sample.pdf
    Download
  • Attachment B - Boulder County Trail Repair Specifications Sample.pdf
    Download
  • Attachment C - Boulder Canyon Trail Repair Bid Tab.xlsx
    Download
  • Attachment D - Contractors Qualification Statement.docx
    Download
  • Attachment E - Curtesy Shuttle Map.pdf
    Download
  • Attachment F BCPOS Rules and Regulations.pdf
    Download
  • Attachment G Purchase Order Terms and Conditions.pdf
    Download
  • Bid Bond Information.pdf
    Download
  • Vendor Information for Bonfire - Fillable.pdf
    Download

Similar open bids

In Colorado

More from Boulder County

Open bids