Hillsborough County (Florida) posted this IFB on Oct 8, 2026. Responses are due Nov 10, 2026. Category: Construction - Heavy & Civil. Solicitation number IFB-26-00398.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Hillsborough County Engineering and Operations Department requires a qualified Contractor to provide services for the project, Intersection Improvements for East County Line Road at Grand Hampton Drive located in Section 2 Township 27S, and Range 19E in Tampa within Hillsborough County, estimated at $1,239,930.07.
This project is to be constructed utilizing Hillsborough County Public Works Standard Specifications for Construction October 2023 Edition; FDOT FY 2025-2026 (or most current Edition) of Standard Plans for Road and Bridge Construction; FDOT Standard Specifications for Road and Bridge Construction FY 2025-2026 (or Latest Edition) [...] and the Supplemental Specifications herein.
The CONTRACTOR must provide three (3) Mobile Project Identification Signs for the project and place them at each approach to the project site, or as indicated by the PROJECT REPRESENTATIVE, no later than 5 calendar days after the Notice to Proceed and before the CONTRACTOR begins any on-site work, whichever occurs first.
The CONTRACTOR's project schedule shall encompass the project's entire construction duration specified in the CONTRACT and may not indicate a shorter duration. [...] The CPM schedule as described in Section 01311 of the Standard Specifications shall be required under this contract.
All pedestrian facilities shall be constructed in accordance with the Americans with Disabilities Act (ADA) and the Department of Transportation Regulation 49 CFR, Part 37.
The contractor is responsible for all maintenance of the new traffic signal from the moment the construction starts until all discrepancies or punch list items have been corrected and the traffic signal is deemed "acceptable".
The 24/7 flasher will be mounted on a 4-1/2" OD aluminum pole.
The Contractor shall complete the Work to be performed under this Agreement within **270 Days** from the written Notice to Proceed Date. In addition to the number of Days specified in the preceding sentence, 54 Days have been included in the Contract Time for allocation to the Contractor for performance of Allowance Work in accordance with the Allowances provision of the Contract Documents.
In connection with this solicitation and its resulting Contract, a goal of 5% has been established for participation by SBE as Subcontractors.
Sign up free to get these 32 documents.